INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN
EN | 10-2018
DOC N° ST0 9183-02
37
20.
MAINENANCE OF VESSEL BEARINGS
The vessel bearings must be inspected and
greased at the alarm “TImE FOR SERVICE” or at
least every two years.
1
grease nipple
Fig. 25