![Electrolux European Wine Tower Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/electrolux/european-wine-tower/european-wine-tower_service-manual_100902030.webp)
30
11. Close both of the manifold gauge valves. If
the high-side gauge reading rises, the pinch-
off must be corrected before proceeding.
12. Remove the high-side process tube adaptor
and solder the process tube closed.
13. Clamp the low-side process tube with the
pinch-off tool while the unit is running.
Remove the low-side process tube adaptor
and solder the process tube closed.
14. Check the process tubes for refrigerant leaks.
Hot Tube
Evaporator
Condenser
Compressor
2 Stage
Vacuum Pump
Heated
Charging
Cylinder
Process Tube
Adapters
Filter Drier
Pressure
Gauge
Compound
Gauge
Gauge
Manifold
T-Fitting
Final Leak Test
1. With the refrigerator turned OFF leak test all
low-side system components.
2. Turn the unit ON and run until the condenser
is warm. Leak test the high-side system
components.
D - Refrigeration System
Figure E2
Содержание European Wine Tower
Страница 1: ...Service Manual European Wine Tower 5995534509 March 2009 ...
Страница 18: ...18 C Electrical Components Operation Electrical Wiring Diagram ...
Страница 19: ...19 C Electrical Components Operation Electrical Wiring Diagram ...
Страница 47: ......
Страница 48: ......