Ceiling Suspension (Continued)
Step 2: Assemble SAM’s to Array Bracket
Attatch the Strong Arm Mounts to the Array Bracket (Item 1) using 4 Screws (Item 3), 4 Flat Washers (Item 4), and 4
Lock Nuts (Item 5) per SAM as shown in Figure 2.
(Item 1)
Array Bracket
Figure 2
Evid 6.2/4.2 Bracket Assembly
(Item 3)
Screws
(Item 4)
Flat
Washers
(Item 5)
Lock Nuts
Strong-Arm
Mount
(SAM)
Figure 3
Threaded Rod Installation