background image

 

 

 
 

 

 
 
 
 

 

H.R.UV-C SPA - PRO 

 

Installation and Operating Manual 

 

                                                  HRP-30-SPA 

 

                              
 

                                                    

 

 
 
 

ENGLISH 

 

Содержание H.R.UV-C SPA-PRO

Страница 1: ...H R UV C SPA PRO Installation and Operating Manual HRP 30 SPA ENGLISH...

Страница 2: ...ATING INSTRUCTIONS 9 4 1 Flow requirements 9 4 2 Water quality 9 4 3 Lamp life indicator intelligent dosing pump Digital 9 5 MAINTENANCE 14 5 1 Essential parts to carry out annual maintenance includin...

Страница 3: ...o the eyes and skin This unit must be earthed Power must be supplied through a Residual Current Device RCD with a rated residual operating current not exceeding 30mA Do not run this unit dry Do not co...

Страница 4: ...4 Fig 1 Dimensions...

Страница 5: ...uired Both the lamps and the quartz sleeve can be replaced from either end of the unit if installing vertically the 1m clearance space must be above or below the unit if installing horizontally the 1m...

Страница 6: ...fter of any pumps filters and heating devices but upstream before of any chemical dosing or similar water treatment see Figs 4 and 5 Fig 4 3 3 Flow direction The H R UV C SPA is factory set to accept...

Страница 7: ...housing and turned with force If the flow switch has been rotated it is important to ensure that it is finally locked in the correct orientation perpendicular at right angles to the flow of water 3 4...

Страница 8: ...be installed by a qualified Electrician following the instructions provided in this manual The manufacturer will not be liable for any issues caused by poor or improper installation Any alterations ma...

Страница 9: ...work as soon as the power is switched on 4 2 Water quality The water quality MUST be within the following limits PH 6 8 8 0 Total Alkalinity TA 80 140 ppm parts per million Chloride Content MAX 150 mg...

Страница 10: ...ring cap 1 and component 2 then push the pipe onto component 3 STEP FOUR Once all components are looped through the tubing tighten securing cap STEP FIVE Lastly unscrew the retaining gland and insert...

Страница 11: ...p s cannot be switched on unless the unit is receiving sufficient flow See page 9 for flow requirements UV Lamp Life Whenever the UV lamp is On a timer counts down from 9 000 hours and the remaining U...

Страница 12: ...this time every day 24 Hours NOTE The time selected must be at a time when the main filtration pump will be running Once the desired time has been selected press the O K button and the display will t...

Страница 13: ...n Part 1 the display will show CL DOSE using the buttons select the correct dosage volume in ml millilitres Once the correct dosage volume is displayed press the O K button to confirm the display will...

Страница 14: ...e shock dose will only begin if the main filtration pump is operational 5 MAINTENANCE To avoid any water leaks and optimum performance annual maintenance of the UV steriliser is essential Failure to d...

Страница 15: ...e clip in shown direction to unlock from body 2 Pull the second side after unlocking the 1st side Remove Lamp holder Clip from Hard cap Unmount the Hard cap from Blue lamp Holder Carefully remove the...

Страница 16: ...ill limit the effectiveness of the UV lamp s Assembly process Firstly slide the clean dry quartz glass sleeve into the unit Locate the O rings carefully on the ends of the quartz sleeve Make sure the...

Страница 17: ...a combination of the UVC and water flow As a matter of course they should be inspected whenever a lamp change is carried out to ensure they are not showing excessive wear and tear Replacement parts a...

Страница 18: ...ies in place in order to seal to the connection points Once securely in place cut the excess tie and dispose of STEP FIVE Place dosing tube into position on the left hand side Carefully rotate the cam...

Страница 19: ...ainst faulty workmanship and materials for two years within Europe one year outside Europe The manufacturer will replace or repair at its discretion any faulty units or components returned to the Comp...

Страница 20: ...ne square on the graph paper to represent a metre or foot square of pool When you have completed count the squares For partial squares count anything over half as one and ignore any under a half When...

Страница 21: ...21 Notes...

Страница 22: ...Hertfordshire SG1 2BH United Kingdom __________________________________________________________________________________ Customer Information ATTACH TO HEATER Company Name Contact Name Daytime Telepho...

Страница 23: ...23...

Страница 24: ...24 Unit 11 Gunnels Wood Park Stevenage Herts SG1 2BH Sales elecro co uk www elecro co uk 44 0 1438 749474 Copyright MANE321 EN H R UV C SPA PRO Manual V1 29 09 2021 Elecro...

Отзывы: