
29
Operating manual VARION® C-POWER 50.0 / 09.2019
Assembly
5.3.11 Checking the connections
Once the assembly process is complete, the following points
must be checked:
B
Leak-tightness of all lines.
B
Flexibility of all lines to the generation unit.
B
Tight fit of all connections in the control cabinet.
B
No damage, kinks or pinches in the cabling and lines.
B
The siphon of the condensate drain is filled with water.
B
Tension-free installation of all lines to the generation
unit.
A
Check the system.
If the exhaust air and flue gas are extracted together:
A
Ensure that the system is fitted with a suitable exhaust
air kit.
If the exhaust air or flue gas is extracted in combination with
another heat source (peak load boiler or another system):
A
Ensure that the system is fitted with a suitable backflow
preventer.
Following assembly, the commissioning of the system can
be arranged with the manufacturer (or a specialist partner
authorised by the manufacturer).
Commissioning request.
Download forms:
Ј
www.elco.net
A
Arrange a time and date for the commissioning.
Содержание VARION C-POWER 50.0
Страница 1: ...Made in Germany Operating manual Combined heat and power unit VARION C POWER 50 0 09 2019...
Страница 41: ...41 Operating manual VARION C POWER 50 0 09 2019 Appendix...
Страница 42: ...42 Operating manual VARION C POWER 50 0 09 2019...
Страница 43: ...43 Operating manual VARION C POWER 50 0 09 2019...