EL-CELL ECC-PRESS Скачать руководство пользователя страница 8

 

Page 8 of 18

 

Manual_ECC_PRESS_Release_3.6.docx / 12.06.2017 

 

 

 

5  Assembly and Connection 

 

The test cell can either be operated in 2-electrode or 3-electrode (reference) 
configuration. In the following, the cell assembly is described for operation with a 
lithium metal reference electrode. For more details, and for 2-electrode operation, 
please refer to the separate manuals of the ECC-Ref and the ECC-Std test cell. 
 
Generally, all assembly steps are to be carried out in inert glove box atmosphere, 
and all components used are to be dried upfront in a vacuum oven at 80°C for at 
least 12 hours. The pressure sensor together with the transfer line may remain 
permanently attached to the stand. 
 

Assembly: 

i) 

Load the feed-through hole of the Ref sleeve with a small amount of lithium 
metal with the aid of a metal wire. A dedicated tool is optionally available to 
ease the procedure (

https://el-cell.com/products/tools-accessories/ecc-

refload

). 

ii) 

Insert the Ref sleeve into the cell base. 

iii) 

Mount the locking ring, thereby aligning the side opening of the cell base with 
the feed-through hole of the Ref sleeve. 

iv) 

Attach the reference pin assembly to the cell base.  

v) 

Place the counter electrode (e.g. a lithium metal disc, 0.2 mm thick, 18 mm 
diameter) into the sleeve 

vi) 

Put the glass fibre separator on top. 

vii) 

Dispense a defined amount of electrolyte onto the separator, and place the 
working electrode, with its active layer downside, on top inside the sleeve. 

viii) 

Insert the plunger, the lid seal and the spring. 

NOTE

: Two types of lid seals 

are provided made of LDPE and PEEK, respectively. The PEEK seals are 
recommended for use at elevated temperatures and for lowest leakage rates. 
Lid seals are single-use components. Re-use may result in increased leakage.  

ix) 

Optionally, insert the dead volume spacer into the spring. 

NOTE

: The smaller 

the dead volume, the higher the pressure change 

p/

V for a given amount of 

gas. 

x) 

Attach the cell lid, insert the cell into the bracket, and tighten the wing nut. 

xi) 

Connect the cell towards the pressure sensor by attaching the transfer line to 
the sensor port of the cell. 

 

   

 

Содержание ECC-PRESS

Страница 1: ...2010 2017 EL CELL GmbH Electrochemical Test Cell ECC PRESS DL User Manual Release 3 6 2017 06 12...

Страница 2: ...lity arising from the use or application of this product Contents 1 Product Description 3 2 Features and Specification 3 3 Safety Precautions 7 4 Unpacking 7 5 Assembly and Connection 8 6 Sample Valve...

Страница 3: ...re are provided for seamless integration with external instruments As an option all relevant signals of the experiment cell pressure temperature cell potentials and current may be recorded with an int...

Страница 4: ...ectronics with analog outputs for pressure and temperature Optional integrated USB data logger for recording of cell pressure temperature cell potentials and current Adjustable dead volume between 3 0...

Страница 5: ...are easily accessible for post mortem analysis Reusable cell components except for lid seals Small and defined electrolyte volume down to 0 05 cm3 Adjustable reproducible and homogeneous mechanical p...

Страница 6: ...r pressure and temperature Resolution of pressure analog output 0 05 of measurement range Error of pressure analog output 0 5 of measurement range comprising non linearity including hysteresis and non...

Страница 7: ...NOTE Damaged shipments must remain with the original packaging for freight company inspection List of Components 1 ECC Press test cell with pressure sensor fully equipped for use in both 2 electrode...

Страница 8: ...sleeve into the cell base iii Mount the locking ring thereby aligning the side opening of the cell base with the feed through hole of the Ref sleeve iv Attach the reference pin assembly to the cell b...

Страница 9: ...front panel of the controller box The rightmost column in the table below refers to the terminology used for the lead connections of Biologic potentiostats MPG 2 SP VSP and VMP series Both the pressu...

Страница 10: ...n the PTFE ferrule and is thus preventing any bleeding through the pierced septum In order to draw a gas sample i pierce the septum with the sample syringe ii open the valve by turning the valve handl...

Страница 11: ...close down all active programs c On the installation CD run X setup This will install the EC Link data logger software Follow any instructions that may appear on your screen d Once installation is fi...

Страница 12: ...iologic potentiostat MPG 2 SP VSP and VMP series is described as an example The Biologic potentiostats feature two analog inputs that are used here to record both pressure and temperature 1 Connect th...

Страница 13: ...opriate solvents Ultrasonic cleaning is recommended Persistent dirt on the cell base and plunger may be removed by treating these components with aqueous nitric acid 20 2 hours at room temperature All...

Страница 14: ...Page 14 of 18 Manual_ECC_PRESS_Release_3 6 docx 12 06 2017 10 Accessories and Spare Parts...

Страница 15: ...Page 15 of 18 Manual_ECC_PRESS_Release_3 6 docx 12 06 2017 ECC PRESS Test Cell...

Страница 16: ...M9 connector to auxiliary input connector of the Biologic potentiostat The cable shield is tied to both connector housings Part No ECE1 00 0040 B Pin Signal Cable Color Comments 1 V1 Red Red plug 2 V2...

Страница 17: ...mbH for repair 1 Send an e mail to info el cell com to obtain a return authorization number and a decontamination report form 2 Sign the decontamination report asserting that the instrument has been d...

Страница 18: ...le care modification or the attachment of improper devices to the goods This Limited Warranty does not cover expendable items This warranty is void when repairs are performed by a non authorized perso...

Отзывы: