background image

 

 

 

 

          Revision 1.0. Released on 19

th

 of February, 2013. 

STEP 4:  INSTALLING THE MOUNTING PLATE: 

STEP 5: FINISHING THE INSTALLATION 

Screw in the four (4) rubber vibration dampers into the threaded holes on the 

bottom side of the reservoir. Do not use any tools to fasten the dampers in to 

position, use thumbs only. 

Then use enclosed M4x4 DIN 7984 screws to install the metal plate on the 

reservoir using enclosed Allen key 2.5mm. 
 

Secure the metal plate through the openings to the computer chassis using 

enclosed M4x6 ISO7380 screws, washer and M4 nut. User may need to drill 4 

(four) Φ4mm holes through chassis metal using electric power drill if there are 

no appropriate mounting holes available. 

 

 

 

The EK-XRES DCP 2.2 offers three inlet (suction) G1/4 ports. In order to use 

the selected port as inlet it is mandatory to use the enclosed EK-Extender G1/4 

with the G/4 threaded fitting. Use enclosed G1/4 Plugs to plug the remaining 

two unused ports. In order to make air bleeding process easier one can install 

the enclosed PU mesh in the inlet compartment of the XRES. 

 

STEP 6:  CONNECTING YOUR RESERVOIR 

 

Connect  two  G1/4  threaded  fittings  to  the  reservoir  (IN  /  suction)  and  pump  (OUT  /  pressure).  Please  note  the  water  flow  orientation.  EKWB 

recommends  using  EK-CSQ  fittings  and  EK-CSQ  Adapters  with the  EK-XRES  DCP  2.2  series  reservoirs.  To  ensure  that  the  tubes are  securely  attached  to  the 

barb/fittings, please use hose clamps or an appropriate substitute.

 

 

 

STEP 5: FILLING THE RESERVOIR                                              

 

 

Unscrew the top cap and fill the coolant in the reservoir. Make sure the liquid is not spilled over your computer or any electrical devices nearby. Run your pump 

shortly for couple of times to make sure water floods your tubes and other water cooling components. Repeat the procedure until you are done and pay attention 

to  the  water  level  in  your  reservoir.  Lowest  level  of  the  coolant  should  be  at  least  1  cm  above  the  plastic  (Acetal)  base  of  the  reservoir.  The  highest 

recommendable water level is approximately 0.5cm below the top of the acrylic tube. Once done with the filling process please close your EK-XRES DCP 2.2 by 

reinstalling the end cap, twisting it clock-wise. 

STEP 5:  OTHER INSTRUCTIONS  

VERY IMPORTANT NOTICE: 

Once the installation is completed, it is a recommended practice to test the cooling circuit for leaks prior to powering up the computer. We recommend a 24 hour leak test prior to powering 

up the computer. Do not test the product using tap water pressure. This will rupture the top of the housing and render the product unusable (and will void your warranty). While all efforts have been made to provide the 
most comprehensive tutorial possible, EK Water Blocks assumes no liability expressed or implied for any consequential damage(s) occurring to your equipment as a result of using EK Water Blocks cooling products, either 
due to errors or omissions on our part in the above instructions, or due to failure or defect in the EK Water Blocks cooling products. 

WARRANTY: 

Our products are warranted against defects in materials or workmanship for a period of 24 months beginning from the date of delivery to the final user. During this period, products will be repaired or have 

parts replaced at our discretion provided that: (I) the product is returned to the agent from whom it was purchased; (II) the product has been purchased by an end user and has not used for commercial purposes;  (III) the 
product has not been misused, handled carelessly, or used in a manner other than in accordance  with the instructions provided describing its installation and proper use. This warranty does not confer rights other than 
those expressly set out above and does not cover any claims for consequential loss or damage.  This warranty is offered as an extra benefit and does not affect your statutory rights as a consumer. This warranty is voided if 
the product comes in contact with aggressive UV additives or other improper liquids. 

 

REQUIRED TOOLS: 

philips head screwdriver

        

power drill with 4mm drill bit (optional)

 

 

 

Water in

 

Rubber 
vibration 
dumper 

Screw M4x4 
DIN 7984 

EK-Extender G1/4 

Water out

 

Metal plate 

G1/4 Fitting 

Plastic foam 

DCP 2.2 Pump 

Отзывы: