background image

 

 

 

 

          Revision 1.0. Released on 19

th

 of February, 2013. 

 

Installation and mounting manual for

 EK-XRES DCP 2.2 Reservoir 

This product is intended for installation only by expert users. Please consult with a qualified technician for installation. Improper installation may result in damage to your equipment. EK Water Blocks assumes no liability 
whatsoever, expressed or implied, for the use of these products,  nor their installation. The  following instructions  are subject to change without notice. Please visit our web site at 

www.ekwb.com

 for updates.  Before 

installation of this product please read important notice, disclosure and warranty conditions printed on the back of the box. 
 

Before you start using this product please follow these basic guidelines: 

1.

 

Please carefully read the manual before through before beginning with the installation process! 

2.

 

The EK High Flow and EK-PSC or EK-CSQ type fittings require only a small amount of force to screw them firmly in place since the liquid seal is ensured by the rubber o-ring gaskets.

 

3.

 

The use of quality, market proved corrosion inhibiting coolants is strongly recommended for any liquid cooling system.

 

GENERAL INFORMATION.

 Sample picture of exploded EK-XRES DCP 2.2

 

STEP 1: PREPARING THE PUMP 

 

Unscrew  original  M3  screws  with  Philips  head  screwdriver 

and  store  them  in  a  safe  place.  These  screws  will  not  be 

needed any more. 

 

 

STEP 2:  PREPARING THE PUMP CONTINUED 

STEP 3: CONNECTING THE PUMP AND RESERVOIR 

Use four enclosed M3x16 DIN 7991 countersunk screws and attach 

interconnection metal plate to the pump with enclosed Allen key 2mm. 

 

 

ATTENTION! 

Pay special attention to 
orientation of the 
interconnection metal plate. 
The screws head must be 
aligned (flushed) with the 
metal plate. 

In order to connect the reservoir and 
the pump please follow these steps: 
 

1)

 

Install the provided gasket (o-
ring) into the milled groove as 
shown on the picture below. 
Failing to do this will cause 
serious leakage. 

2)

 

Use four enclosed M3x8 DIN 
7991 (countersunk) screws and 
attach pump to the reservoir 
with enclosed Allen key 2mm. 

 

CAUTION: 

Be extremely careful not to overtighten the M3 
screw. Doing this may strip the thread and 
render product useless. 
 

TROUBLESHOOTING: 

-

 

If the threaded holes do not align 
please re-check STEP 2 in the 
manual. 

-

 

If the screw head does not 
align (flush) with the metal 
plate please re-check STEP 2 in 
manual. 

O-ring 

M3x8 
screw 

Отзывы: