background image

- 8 -

STEP 1

Plug the 3-pin connector from the water block’s D-RGB LED light to 
the DRGB HEADER on the motherboard. The LED will work if the pin 
layout on the header is as follows: 

+5V, Digital, empty, Ground.

Please ensure that the arrow indicated on the connector is 
plugged into the +5V line as indicated on your motherboard. 
If you put the LED Diode to the 12V RGB HEADER you 
can damage the LEDs. Failure to do so will damage your 
motherboard or LED strip. 

D-RGB HEADER

RGB HEADER

STEP 1

CONNECTING THE D-RGB LED STRIP

To make sure the installation of EK components was successful, we 
recommend you perform a leak test for 24 hours. When your loop 
is complete and filled with coolant, connect the pump to a PSU 
outside of your system. Do not connect power to any of the other 
components. Turn on the PSU and let the pump run continuously. 
It is normal for the coolant level to drop during this process as air 
collects in the distribution plate. Inspect all parts of the loop, and 
in the eventuality that coolant leaks, fix the issue and repeat the 
testing process. Ensure that all hardware is dry before the system is 
powered on in order to prevent any damage.

TESTING THE LOOP

Содержание EK-Quantum Velocity Ryzen Edition UNC Standoffs - AM5

Страница 1: ...USER GUIDE EK Quantum Velocity Ryzen Edition UNC Standoffs AM5...

Страница 2: ...ages incurred due to improper or inappropriate installation Before you start using this product please follow these basic guidelines Please carefully read the manual before beginning the installation...

Страница 3: ...BOX CONTENTS 4 PREPARING THE AM4 WATER BLOCK FOR UPGRADE 4 PREPARING THE AM5 MOTHERBOARD 5 INSTALLING THE WATER BLOCK 7 CONNECTING THE D RGB LED STRIP 8 TESTING THE LOOP 8 WARRANTY 9 SUPPORT AND SERVI...

Страница 4: ...sure to have a clean flat surface to work on It is recommended to put foam or soft material to lay a motherboard on STEP 1 If the EK Quantum Velocity Ryzen AM4 water block is already installed unscre...

Страница 5: ...PLATE STEP 1 Using a Philips head screwdriver remove the four UNC 6 32 screws securing the original plastic hold down clamps around the socket as shown in the illustration Remove the hold down clamps...

Страница 6: ...thermal compound Apply the enclosed thermal grease thermal compound on the CPU heat spreader IHS as shown in the image The layer of the thermal compound must be thin and even in thickness over the en...

Страница 7: ...NG THE WATER BLOCK STEP 2 STEP 2 Align the water block over the mounting screws on the motherboard Place a saved compression spring and thumb nut over each AM5 Mounting screw Start fastening two thumb...

Страница 8: ...ECTING THE D RGB LED STRIP To make sure the installation of EK components was successful we recommend you perform a leak test for 24 hours When your loop is complete and filled with coolant connect th...

Страница 9: ...the instructions manual This warranty does not confer rights other than those expressly set out above and does not cover any claims for consequential loss or damage This warranty is offered as an ext...

Страница 10: ...spare parts or a new mounting mechanism please contact https www ekwb com customer support EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU SUPPORT AND SERVICE EKWaterBlocks EKWaterBlocks ekwaterblo...

Отзывы: