background image

- 7 -

3a. 

Included M4 nuts, washers and M4x10 screws can be used to mount 
the flat reservoir to a fan.

INSTALLING EK-QUANTUM VOLUME / KINETICFLT  RESERVOIR IN TO THE CASE

120 mm Fan

UNC 6-32 x 30 

ISO 7380 Screw

3b. 

Using 30mm long screws supplied with your radiator the reservoir 
can be mounted onto the radiator and 25mm thick fans together.

M4 x 10 DIN 

7984 Screw

M4 Nut

M4 metal Washer

Содержание EK-Quantum Kinetic FLT Series

Страница 1: ...INSTALLATION MANUAL EK Quantum Volume Kinetic FLT...

Страница 2: ...se intended for fans or radiators may damage your product Before you start using this product please follow these basic guidelines Please carefully read the manual before beginning with the installati...

Страница 3: ...DIRECTLY 5 INSTALLING EK QUANTUM VOLUME KINETIC FLT WITH SUPPLIED MOUNTS 6 INSTALLING EK QUANTUM VOLUME KINETICFLT RESERVOIR IN TO THE CASE 7 ATTACHING THE FITTINGS 9 CONNECTING THE D RGB LED STRIP 1...

Страница 4: ...4 FLT Reservoir can be mount in multiple directions Vertically and horizontally position is optional Do not mount FLT Reservoir when the pump is in dead position...

Страница 5: ...included M4 screws you can mount the reservoir directly to your chassis or any other standard fan mounting location INSTALLING EK QUANTUM VOLUME KINETIC FLT DIRECTLY M4 x 10 DIN 7984 Screw M4 x 10 DI...

Страница 6: ...mp is required EK supplies a pair of FLT mounts along with M4 nuts washers and additional screws They can be positioned across any pair of mounting holes in several orientations STEP 1 Position the mo...

Страница 7: ...o a fan INSTALLING EK QUANTUM VOLUME KINETICFLT RESERVOIR IN TO THE CASE 120 mm Fan UNC 6 32 x 30 ISO 7380 Screw 3b Using 30mm long screws supplied with your radiator the reservoir can be mounted onto...

Страница 8: ...x 10 DIN 7984 Screw M4 Nut 3d Lastly the supplied M4 nuts washers and M4x10 screws may be used to secure the reservoir to a case with the mounts This is useful when there is no clearance behind for th...

Страница 9: ...ING THE FITTINGS EK Quantum Volume FLT has two ports which can be used as inlet or outlet the chosen outlet should connect directly to your pump The reservoir should be positioned above the pump to en...

Страница 10: ...OOP To make sure the installation of EK components was successful we recommend you perform a leak test for 24 hours When your loop is complete and filled with coolant connect the pump to a PSU outside...

Страница 11: ...r assistance please contact http support ekwb com EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVICE SOCIAL MEDI...

Отзывы: