background image

All disclosures, notices and warranty conditions are being written on EKWB web page.  Please check terms of use.                    Revision 1.0. Published on April 15

th

, 2015   

 
 
 
 
 
 

3. ATTACHING THE BLOCK TO THE GRAPHIC CARD

. Use a Philips screwdriver with the enclosed 

M3x4 DIN 7985 screws. EKWB recommends users to start tightening the screws around the GPU core 
and continue outwards. To secure the I/O bracket please use enclosed M2,5x6 DIN 7985 screw. 

 

 

3. cont..:  Secure the M2,5x6  DIN 7985 screw that holds the I/O 
bracket from the front side using M2,5 nut and PVC washer. 

STEP 4:  CHECKING FOR CONTACTS

 

If necessary temporarily remove the water block to check for uniform surface contact between the block and the components, pay special attention to the VRM section of 
the graphics card. Check whether the water block makes contact with the intended integrated circuit. Then repeat sub-steps in previous section to re-attach the block. 

In 

case you fail to obtain good contact, please check again that your thermal pad thickness or contact our support service at 
http://www.ekwb.com/support.

 

STEP 5:  INSTALLATION OF FITTINGS AND TUBING

 

Screw in the two G1/4 threaded male fittings. Attach the liquid cooling tubes and connect the water-block(s) into the cooling circuit. 

EKWB recommends using EK-CSQ 

fittings with the EK-FC980 GTX Classy KPE series water blocks

. To ensure that the tubes are securely attached to the barb/fittings, please use hose clamps or an 

appropriate substitute.

 

 

You can use any opening as an inlet/outlet port. 
 

CAUTION:

 In case of using connectors other than EK-CSQ series compression fittings, take special attention to the length of the fittings’ male G1/4” thread. 5mm is the 

maximum allowed G1/4” thread length!

 

 

 

STEP 6:  INSERTING THE CARD IN YOUR PC CASE

 

Carefully lift your graphics card with installed block and insert it in your PC’s motherboard PCI-express expansion slot. Please bear in mind that your graphics card is 

probably heavier than when it was equipped with original heat sink fan assembly. One needs to be very careful when handling the graphics card. Avoid all un-needed 
manipulation of the VGA/water block assembly that might damage your card or water block during final installation.

 

REQUIRED TOOLS: 

   scissors              

  Philips head screwdriver        

 thermal grease 

 

 

 

 

 

 

 

 

 

Screw M3x4 DIN7985

 

PVC washer

 

This screw applies only to 
secure the I/O bracket. 
Please use enclosed 
M2,5x6 DIN 7985 screw. 

EK-PSC Fitting 

Tubing 

EK-Plug G1/4 

Acetal Terminal 

I/O Bracket

 

PVC washer

 

M2,5 NUT

 

M2,5x6 screw

 

Отзывы: