background image

All disclosures, notices and warranty conditions are being written on EKWB web page.  Please check terms of use.   

 

Revision 1.0. Published on June 21

st

, 2013 

STEP 3:  PREPARING YOUR WATER BLOCK 

 

PLACING WATERBLOCKS BLOCK ON MOTHERBOARD. Place the EK-FB KIT GA Z97X-SOC Force water blocks with pre-installed standoffs gently to the motherboard or vice 
versa. Make sure that mounting holes are aligned. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

STEP 4:  ATTACHING THE BLOCK TO THE MOTHERBOARD 

 

STEP 5:  CHECKING FOR CONTACTS 

Prior to fastening the screws please make sure the mounting holes on the motherboard’s 

circuit board are aligned with water block. 

 

Use 6 (six) M3x4 DIN7985 screws and 6 (six) PVC washers. Tighten the screws, beginning 

near the center of the board and continue evenly outwards. EK recommends installing loosely 

first  all  the  screws and  only then start  fastening  them.  Do not  use excessive  force  when 

tightening the screws! Use the enclosed screws and washers as shown in picture below:  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temporarily  remove  the  water  block  to  check  for  uniform  surface  contact 

between the block and the components. Note the pattern of contact on a piece 
of paper. Then repeat steps 3 and 4 to reattach the block applying more or less 

pressure to the areas where you have found it necessary. Note that there is no 
need for perfect thermal pad imprint on the inductors/coils (mentioned in STEP2) 

6. POSITIONING FITTINGS AND CONNECTING TO WATER CIRCUIT 

 

Attach the liquid cooling tubes and connect the water-block(s) into the cooling circuit. EKWB recommends using EK-CSQ compression fittings with the EK-FB GA Z97X-SOC 

Force series water block. You can use any opening as an inlet/outlet port. Plan your tubing routing in advance! 
 

  

 

 

       

 

REQUIRED TOOLS AND MOUNTING SCREWS: 

 scissors  

 philips screwdriver    

 thermal grease

 

 

Chip die thermal grease imprint 

Thermal pad imprints 

PLEASE NOTE

When using fittings with G1/4 
thread longer than 5 mm it is 
mandatory to use the enclosed EK-
Extender 1,8 mm! 

M3x4 Screws 

PVC washers 

Tubing 

EK CSQ Fitting 

Отзывы: