background image

- 9 -

STEP 4 

REMOVING THE TERMINAL METAL PLATE

The Metal plate attached on the Terminal is meant as a precaution, 
to secure the two O-rings to prevent them from falling out of their 
sockets during transport and handling. Before the installation of 
the Active Backplate, this metal plate has to be removed. Unscrew 
the three (3) M4 x 27 DIN7984 screws with the provided 2.5 mm 
Allen Key shown on the picture. Keep the screws as they will be 
needed in the upcoming step, unlike the metal plate which will not 
be needed anymore.

STEP 4

M4 x 27 7984DIN SCREW

TERMINAL METAL PLATE

3090 Version

Thermal Pad G 1.0 mm 

Thermal Pad G 1.5 mm 

Thermal Pad G 2.0 mm

STEP 3

Содержание 3831109836477

Страница 1: ...USER GUIDE EK Quantum Vector Trinity RTX 3080 3090 Active Backplate...

Страница 2: ...esebasicguidelines Carefully read the manual before beginning with the installation process Remove your graphics card from the computer for the safest mounting process to prevent any possible damage t...

Страница 3: ...AND MAIN PARTS 6 INSTALLING THE ACTIVE BACKPLATE 7 PREPARING THE GRAPHICS CARD 7 CUTTING AND PLACING THERMAL PADS 8 REMOVING THE TERMINAL METAL PLATE 9 ATTACHING THE ACTIVE BACKPLATE 10 INSTALLING FI...

Страница 4: ...llen Key 2 5 mm 1 pc M2 5x7 AX1 Screw 7 pcs M2 5x4 AX1 Screw 3 pcs EK Quantum Vector Trinity RTX 3080 3090 Active Backplate D RGB PVC Washer M2 5 10 pcs Thermal Pad G 1 0 mm 3 pcs Thermal Pad G 1 5 mm...

Страница 5: ...5 ACTIVE BACKPLATE DIMENSIONS 124 25 mm 110 35 mm 139 35 mm 233 mm 112 75 mm 33 35 mm Phillips Head Screwdriver Scissors REQUIRED TOOLS...

Страница 6: ...RGB Cable Length 500 mm D RGB LED Count 9 D RGB Connector Standard 3 Pin 5V Data Blocked Ground AB TERMINAL ALU BACKPLATE COLDPLATE NICKEL TOP PLATE PLEXI ACETAL EK BADGE LEDD RGBSTRIP OPTIONAL M2 5x5...

Страница 7: ...original terminal along with two 2 15x1 O rings on the EK Quantum Vector Trinity RTX 3080 3090 water block has to be removed Unscrew the three 3 M4 x 27 DIN7984 screws and detach the terminal from th...

Страница 8: ...provide you with more than an adequate quantity of thermal pads to complete this Step You must remove the protective foil from both sides of the thermal pad before installation Replacement thermal pad...

Страница 9: ...the installation of the Active Backplate this metal plate has to be removed Unscrew the three 3 M4 x 27 DIN7984 screws with the provided 2 5 mm Allen Key shown on the picture Keep the screws as they w...

Страница 10: ...loosed M4 x 27 7984DIN screws back after attaching the Active Backplate Then position the three 3 M4 x 27 7984DIN screws that were detached from the GPU water block terminal into each of the three 3...

Страница 11: ...t outlet port The pre mounted terminal is positioned for the optimal flow in the EK Quantum Vector Trinity RTX 3080 3090 water block and in the EK Quantum Vector Trinity RTX 3080 3090 Active Backplate...

Страница 12: ...TEP 1 D RGB HEADER RGB HEADER TESTING THE LOOP To ensure the installation of EK components was successful we recommend you perform a 24 hour leak test When your loop is complete and filled with coolan...

Страница 13: ...d assistance please contact https www ekwb com customer support EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVI...

Отзывы: