- 18 -
TESTING THE LOOP
To make sure the installation of EK components was
successful, we recommend you perform a leak test for
24 hours.
When your loop is complete and filled with coolant,
connect the pump to a PSU outside of your system.
Do
not connect the power to any other components!
Turn on the PSU and let the pump run continuously. It is
normal for the coolant level to drop during this process
as air collects in the reservoir.
Inspect all the parts of the loop, and in the case of coolant
leaks, fix the issue and repeat the testing process. Ensure
that all hardware is dry before the system is powered on
in order to prevent any damage.