![ekwb 3831109810316 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/ekwb/3831109810316/3831109810316_user-manual_2374626013.webp)
- 13 -
STEP 7
Tighten the fitting barbs in clockwise direction until the gasket underneath
is compressed.
The installation of the CPU water block is now complete.
With EK-Velocity series water blocks it is mandatory to use the port that
is nearest to the center of the water block as INLET port. Mixing the ports
may result in less than ideal thermal performance of the water block.
STEP 7
FITTING RING
FITTING BARB
INLET PORT
OUTLET PORT
CONNECTING THE RGB LED STRIP (Optional)
RGB LED CONNECTOR