OPERATION
NP-DK50 DI-15_08-2020
15
4. OPERATION
INSTALLATION AND FIRST OPERATION
Do not use the compressor immediately after unpacking as it will not
adjust to the ambient temperature.
Only qualified personnel can install the compressor and put it into
operation for the first time. The installer shall train the operating
personnel in the use and routine maintenance of the equipment.
Installation and training of personnel should be acknowledged by the
installer‘s signature on the installation certificate.
Prior to start-up must be unsecuring the air pump inside. If the
compressor is switched on with securing the air pump, the device
could be permanently damaged.
The compressor does not contain a backup power supply.
Never block the air intake filter on the backside or the vent outlets on
the lower of the equipment.
If the compressor is equipped with a main source of air, the standby air
source must be available.
Any modification of this equipment is forbidden!
If this equipment is used nearby other devices, the equipment must be
observed in order to verify normal operations in the configuration it will
be used.
Devices may be affected electro-magnetically!
Содержание invent DK50 DI
Страница 1: ...User manual EN Manuel de l utilisateur FR N vod na pou itie SK RU N vod k pou it CS...
Страница 2: ......
Страница 62: ...C 62 NP DK50 DI 15_08 2020...
Страница 63: ...C NP DK50 DI 15_08 2020 63 e Caution risk of electric shock...
Страница 64: ...C 64 NP DK50 DI 15_08 2020 Manufacturer IP21 Te...
Страница 65: ...C NP DK50 DI 15_08 2020 65 OUT 7 4...
Страница 66: ...66 NP DK50 DI 15_08 2020 2 1 2 3 4 USB 5 6 7 8 Ethernet 9 10 11 12 13 14 15 16 17 18...
Страница 67: ...NP DK50 DI 15_08 2020 67 BAR PSI E O AC OC 1 7 5 0 65 C 15...
Страница 68: ...68 NP DK50 DI 15_08 2020 AUTO OFF 2 8 AUTO ON 2 5 POWER SAVE FULL OFF 15...
Страница 69: ...NP DK50 DI 15_08 2020 69 DK50 DI STANDBY DK50 DI...
Страница 72: ...72 NP DK50 DI 15_08 2020 4...
Страница 73: ...NP DK50 DI 15_08 2020 73 5...
Страница 74: ...74 NP DK50 DI 15_08 2020 WALL WALL OUT OUT OUT WALL 5 5 80...
Страница 75: ...NP DK50 DI 15_08 2020 75 I I STANDBY RUN...
Страница 77: ...NP DK50 DI 15_08 2020 77 5 o o e...
Страница 78: ...78 NP DK50 DI 15_08 2020 5 a...
Страница 79: ...NP DK50 DI 15_08 2020 79 24 EN 62353 EN 62353 G 77 5000 KIT DI 5K 5000 10 000 KIT DI 10K 10 000 5000 NiMH 9 280...
Страница 80: ...80 NP DK50 DI 15_08 2020 9 031500034 000 5...
Страница 81: ...NP DK50 DI 15_08 2020 81...
Страница 83: ...NP DK50 DI 15_08 2020 83 6 C WALL C SERVICE...
Страница 84: ...84 NP DK50 DI 15_08 2020 7 1 N PE 100 230V 50 60 Hz I PCB XC1 FU1 CB1 M1 YV1 EV1 ST...
Страница 85: ...NP DK50 DI 15_08 2020 85 CO PP DR DV EV AC RV SV P1 P2...
Страница 86: ...86 NP DK50 DI 15_08 2020 8 o IEC 60601 1 2 2014 1 2 o CISPR 11 1 CISPR 11 B IEC 61000 3 2 IEC 61000 3 3...
Страница 145: ...ANNEX ANNEXE PR LOHA P LOHA NP DK50 DI 15_08 2020 145 1 DK50 DI 2 3 1 3 2 4 5 6 A A B B C C D D 7 8 9 5 6 5 6...