STEP 1
In case of replacing the D-RGB LED strip, two (2) M2.5 x 6 AX1
Screws must be removed using Phillips Head Screwdriver (as shown
in the picture).
STEP 1
REPLACING THE LED STRIP (Optional)
To ensure the installation of EK components was successful, we
recommend you perform a 24-hour leak test.
When your loop is complete and filled with coolant, connect the pump
to a PSU outside your system. Do not connect power to any of the other
components. Turn on the PSU and let the pump run continuously.
Inspect all parts of the loop, and in case the coolant leaks, fix
the issue and repeat the testing process. To prevent possible
damage, please ensure that all hardware is dry before the system
is powered on.
TESTING THE LOOP
M2.5 x 6 AX1