Eisenbau Guardbox GP Series Скачать руководство пользователя страница 6

GuaRdboX

 - 

GP

 

series   

 

 

IOM 

(

Installation, Operating & Maintenance Manual)    0002-ENG 

rev.2 

                                      

    

        

 

 

Eisenbau s.r.l. a socio unico 

Via T.A:Edison, 16 20090 Cusago (MI) Italy                

Phone : +390293562116 Fax: +390293567735 

Guardbox production unit : Via XXIV Maggio, 13   

25017 – Sedena di Lonato (BS)   

Phone : +390309131240 Fax: +390309130946

        

 

www.eisenbau.it 

www.guardbox-ex.com 

 

 

 

 

 

Pi / PN 

(inductive 

proximity) / 

(inductive proximity 

namur)

 

Board assembly 

 

 

 

Turn the actuator pinion full CW 

and regulate the cam till the switch 

(1) is activated

 

 

Turn the actuator pinion full CCW 

and regulate the cam till the switch 

(2) is activated

 

 

 

 

Turn the actuator pinion full CW 

and regulate the cam till the switch 

(1) is activated

 

 

Turn the actuator pinion full CCW 

and regulate the cam till the switch 

(2) is activated

 

 

 

 

Turn the actuator pinion full CW 

and regulate the cam till the switch 

(1) is activated

 

 

Turn the actuator pinion full CCW 

and regulate the cam till the switch 

(4) is activated

 

 

 

Turn the actuator pinion full CW 

and regulate the cam till the switch 

(1) is activated

 

 

Turn the actuator pinion full CCW 

and regulate the cam till the switch 

(2) is activated

 

    

 

 

9.

 

 indicator setting: 

 

9.1

 

The 3D indicator (2) is visible on all 4 sides and is fully adjustable on 360° 
without disassembly.  

9.2

 

Loosen  indicator  M5  captive  screws  and  rotate  transparent  indicator  dome 
(1) to desired viewing angle according to valve position. (OPEN or CLOSED 
appearing through indicator window).  

9.3

 

Retighten the four captive M5 screws (3) using a torque of 3,5Nm. 

 
 
 

 
 

 

3,5Nm 

Содержание Guardbox GP Series

Страница 1: ...with a 3D high visibility position indicator that represent a true indication of valve position The indicator is visible on all 4 sides and is fully adjustable on 360 without disassembly Guardbox lim...

Страница 2: ...products in the time between manufacturing and commissioning It is responsibility of the installing personnel to replace the protective caps with suitably temperature rated cable glands 3 10 Product...

Страница 3: ...y between the two shafts must not exceed 0 2 mm 6 4 The motion transmission from the actuator or valve to the box GP is attained by a mechanical coupling Before installation on a valve or an actuator...

Страница 4: ...rcuit board 9 according to the wiring diagram and terminal labelling available inside the box 7 7 Make sure that the electrical wires are steadily tightened and totally inserted into the terminals 4 a...

Страница 5: ...tructions for the proper setting of the special cams or electrical components Following table represents the main cam configurations divided by specific type of switch for applications not represented...

Страница 6: ...he switch 1 is activated Turn the actuator pinion full CCW and regulate the cam till the switch 2 is activated Turn the actuator pinion full CW and regulate the cam till the switch 1 is activated Turn...

Страница 7: ...d to withstand the most severe mechanical fatigue test more than 1000000 cycles and accelerated corrosion test up to 500 hours according to UNI EN ISO9227 However for long time outdoor usage expeciall...

Страница 8: ...0002 ENG rev 2 8 Eisenbau s r l a socio unico Via T A Edison 16 20090 Cusago MI Italy Phone 390293562116 Fax 390293567735 Guardbox production unit Via XXIV Maggio 13 25017 Sedena di Lonato BS Phone 3...

Отзывы: