background image

 

 

 

 

Page 4 of 12 

Drawing   : - TPC378 
Issue 

: - 1 

Date 

: - 24/11/11 

OPERATION 

 

 

The  following  procedures  should  be  followed  to  test  the  ECO150  for  correct 
operation: 
 

 

1. 

After  unpacking,  examine  all  external  features  to  confirm  damage-
free shipment. Report all defects and damage at once.  Connect the 
power cable to a grounded electrical outlet. 

 
 

2. 

Check dehumidification process as follows: 

 

 

 

A.  Place unit on a level surface. 
B.  Start up unit by connection to mains supply and switching the on 

off switch to the ‘I’ position. 

C.   Check that the compressor is running. 

 

D.  Leave the machine running for 15 minutes. 
E.  Observe the evaporator coils through the evaporator filter panel 

 

i.  If the air temperature is below 80° F, an even coating of 

frost should cover the entire evaporator coil 

ii.  If the air temperature is above 80° F, frost and/or droplets 

of  condensed  water  should  cover  the  entire 
evaporator coil.  

  

F.

  After  continuous  running  time  of  approximately  55  minutes,  the 

unit  will  enter  “Hot  Gas”  defrost  mode  for  5  minutes  and  then 
automatically return to normal operation.

 

 

If, after carrying out the above procedures, the unit does not appear to 

function properly, refer to the 

Trouble Shooting

 section, which follows, 

or contact the Factory Service Center. 

 
 
 

 
 
 

After using the ECO150, turn it off for 5 minutes to allow the condensate on 
the coils to drain into the pump reservoir, then turn it back on and press the 
momentary purge switch for twenty to thirty seconds to evacuate the water 
from the pump reservoir.

TO ENSURE CONTINUED FULL EFFICIENCY OF THE 

DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE 

PERFORMED AS FOLLOWS: 

 

CAUTION: 

ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT 

LEAST FIVE MINUTES BEFORE RESTARTING. 

Содержание ECO150

Страница 1: ...Page 1 of 12 Drawing TPC378 Issue 1 Date 24 11 11 ECO150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL www eipl co uk...

Страница 2: ...l and is collected in the condensate tray which is equipped with a permanent drain The cooled air then passes through the hot condenser coil where it is reheated using the same energy removed during t...

Страница 3: ...of refrigerants used in products manufactured by Ebac Industrial Products Ltd is as follows R134a 1300 R407c 1610 For type and weight of refrigerant contained in this unit please refer to the product...

Страница 4: ...aporator coil ii If the air temperature is above 80 F frost and or droplets of condensed water should cover the entire evaporator coil F After continuous running time of approximately 55 minutes the u...

Страница 5: ...frost coated across its surface At temperatures above 80 F the coil may be covered with droplets of water rather than frost Partial frosting accompanied by frosting of the thin capillary tubes indicat...

Страница 6: ...he refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valves to be fitted to any part of the circuit Service valves may leak causing...

Страница 7: ...nsufficient air flow 2 Compressor fault 3 Loss of refrigerant gas 1 Check all of the above 2 Contact the Factory Service Center 3 Contact the Factory Service Center Little or no defrost when required...

Страница 8: ...7 Run Capacitor 3036337 1 8 Solenoid Coil 3030454 1 9 Filter 2053119 1 10 Mains Lead 2029217 1 11 Fan Motor 3040253 1 12 Fan Motor Inlet Ring 3040254 1 13 Fan Motor Capacitor 3030841 1 14 Condensate...

Страница 9: ...Page 9 of 12 Drawing TPC378 Issue 1 Date 24 11 11...

Страница 10: ...Page 10 of 12 Drawing TPC378 Issue 1 Date 24 11 11...

Страница 11: ...Page 11 of 12 Drawing TPC378 Issue 1 Date 24 11 11...

Страница 12: ...8 662590 www eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport News Virginia 23606 2575 USA Tel 01 757 873 6800 Fax 01 757 873 36...

Отзывы: