INSTALLATION 

 
POSITIONING:  
 

Position the LD-82 dehumidifier process dryer in the chamber as shown and 
instructed (see TP 132).  It is advisable to ensure that access can be made to 
the process drying unit even when the entire product to be dried is in place. 
 
The Universal Controller (UC-2) should also be positioned for ease of access 
on the outside of the chamber or adjacent wall. 

 
WIRING: 
 

Connect the LD-82 dehumidifier process dryer to a 230V, 1 phase, 50Hz 
supply as follows:-   

 

 

 

 

 

 

Brown  

 

Live 

 

 

 

 

 

Blue   

 

Neutral 

 

 

 

 

 

Green/Yellow 

Earth (ground) 

 

 

 

 

 

 

DRAINAGE: 

 

Connect a 15mm inside diameter hose to the condensate outlet pipe 
(positioned on the drainage tray, beneath the evaporator coil). Secure the 
hose using a worm drive clip. The hose should at no point be raised higher 
than the outlet pipe. The hose should be ran to a permanent drain. Failure to 
observe this requirement will result in flooding of the LD-82 dehumidifier 
process dryer.

 

 

Содержание LD-82

Страница 1: ...11 16 LD LD LD LD 82 82 82 82 DEHUMIDIFIER PROCESS DEHUMIDIFIER PROCESS DEHUMIDIFIER PROCESS DEHUMIDIFIER PROCESS DRYER DRYER DRYER DRYER 1320500 1320500 1320500 1320500 OWNER S MANUAL OWNER S MANUAL...

Страница 2: ...it is simple to install and operate The process dryer is energy efficient quiet to operate and will cause no pollution problems The Ebac method of drying is a process of dehumidification The LD 82 deh...

Страница 3: ...moisture which is collected and led away The cool air then passes the hot condenser where it is reheated with the same energy removed during the cooling phase With the addition of other radiated heat...

Страница 4: ...anufactured by Ebac Industrial Products Ltd is as follows R134a 1300 R407c 1610 For type and weight of refrigerant contained in this unit please refer to the product data label MODEL LD 82 HEIGHT 600...

Страница 5: ...on the outside of the chamber or adjacent wall WIRING Connect the LD 82 dehumidifier process dryer to a 230V 1 phase 50Hz supply as follows Brown Live Blue Neutral Green Yellow Earth ground DRAINAGE...

Страница 6: ...of the fan motor is to run continuously whenever power is supplied to the dehumidifier The fan motors used in the LD 82 dehumidifier process dryer unit are induction protected i e the motor is able to...

Страница 7: ...e the build up of ice No attempt should be made to cut open any part of the refrigeration circuit due to high pressures and gas involved If the unit is switched off at the mains power supply for any r...

Страница 8: ...using and that it rotates freely The motor is sealed for life and therefore does not require lubrication 3 To check the refrigerant charge run the unit for 15 20 minutes and briefly remove the cover T...

Страница 9: ...he refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valves to be fitted to any part of the circuit Service valves may leak causing...

Страница 10: ...ressor OH Protector 3021529 Compressor Start Relay 3021530 Compressor Start Capacitor 3021531 Condenser Coil 3020740 Evaporator Coil 2320515 Filter Dryer 3020937 Fan Motor 3040214 Heater Element Prote...

Страница 11: ...d This product contains fluorinated greenhouse gases covered by the Kyoto Protocol The refrigeration system is hermetically sealed The Global Warming Potential GWP of refrigerants used in products man...

Страница 12: ...ww eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport News Virginia 23606 2575 USA Tel 01 757 873 6800 Fax 01 757 873 3632 www eba...

Отзывы: