59
Service mode & Calibration
§ Service mode:
B. Set Up 01
B-1: C&B Calibration : Contrast and Brightness calibration adjustment.
B-2: Lamp Total Timer reset : Reset the lamp total time which is display on the first
page of Engineering OSD. This timer will accumulate the total lamp time usage
elapsed from shipping.
B-3: Lamp Recoder Reset: Reset all the lamp time usage recording at Lamp Timer
Recorder page which records (up to 10 times) the each time elapsed after customer
reset lamp time at Presentation menu.
B-4: PIN Reset: PIN code reset
B-5: Logo Memory Reset : Logo image is erased on the flash ram.
B-6: Unit Timer Reset: Unit time is the total working time period of PCBA, which is for
internal usage.
B-7: Filter Timer Test: For EDI Internal testing purpose only.
P.S. If you execute the “ Filter Timer Testing ” function, the filter timer will
show ” 1000 ” operation hours and the alarm system will remind you
to replace filter.
B-8: Lamp Timer Test: For EDI Internal testing purpose only.
P.S. If you execute the “ lamp Timer Testing ” function, the lamp timer will
show ” 1999 ” operation hours and the alarm system will remind you
to replace lamp.
B-9: VK default: the calibration of vertical keystone setting.
B-4
B-6
B-1
B-5
B-2
B-3
B-7
B-8
B-9
Содержание LC-XNB4000N
Страница 1: ...1 LCD Projector Service Manual for EIKI LC XNB4000N Ver A_02 Date 29th May 13...
Страница 5: ...6 Packing...
Страница 6: ...7...
Страница 14: ...15 11 Clicked Download to update 12 Wait for download process Done...
Страница 28: ...29 d Remove the wall e Remove the filter case and filter sponge...
Страница 29: ...30 f Remove 2 screws on the I O board h Turn to bottom side and remove 5 screws on the bottom case...
Страница 30: ...31 i Remove the top cover j Done...
Страница 31: ...32 Disassembly Indication PBCA Disassembly a Remove the cable wire b Remove 6 screws on the PCBA module...
Страница 32: ...33 c Remove the PCBA d Done...
Страница 34: ...35 c Remove 2 screws to remove the lamp blower d Remove 5 screws which fixed the optical engine...
Страница 35: ...36 e Remove the optical engine f Remove one screw and cable...
Страница 36: ...37 g Done...
Страница 38: ...39 c Remove 3 screws to remove the power ballast module d Done...
Страница 40: ...41 c Remove 4 screws of the panel duct to remove the duct and blower d Done...
Страница 43: ...44...
Страница 44: ...45...
Страница 45: ...46...
Страница 46: ...47...
Страница 47: ...48...
Страница 48: ...49...
Страница 49: ...50...
Страница 50: ...51...
Страница 51: ...52...
Страница 52: ...53...
Страница 53: ...54 G G G G...
Страница 54: ...55...
Страница 56: ...57 Service mode Calibration 2 You will see the image as below a Page System Inf b Page Set Up 01...