EIC Solutions AAC-140B-4XT-EP Скачать руководство пользователя страница 7

7

7

7

7    

1

-800-497-4524                   EIC SOLUTIONS, INC

.

                       215-443-5190 

2.3  PREPARING THE ENCLOSURE 

To  mount  the  400  Btu  unit  you  will  need  to  cut  an  opening  in  your  enclosure  and  drill 

mounting holes.  A cut out drawing (Fig. 2.3) showing the cut out size and hole locations has been 
included  in  this  manual  (see  Fig.  2.3).    You  also  received  a  cut  out  stencil  with  your  air 
conditioner.  The instructions for installing the air conditioner are printed below.   

TOOLS AND MATERIALS NEEDED: 

 

AAC-140B-4XT cut out stencil 

 

Center Punch 

 

Tape Measure and pencil 

 

Jigsaw or suitable alternative 

 

Electric drill 

 

# 29 drill bit (.136”) 

 

# 8-32 tap and tap handle 

 

Twelve # 8-32 x 3/8” stainless machine screws (supplied) 

 

Twelve nylon washers (supplied) 

 

One neoprene gasket (supplied) 

 
CUT THE OPENING AND DRILL MOUNTING HOLES IN THE ENCLOSURE 

1.

 

Using the guidelines provided in the installation manual choose an appropriate location for 
the air conditioner on your enclosure. 

2.

 

Tape the cut out stencil to the enclosure in the location you have chosen.   

3.

 

Before  marking,  cutting  or  drilling  check  that  the  location  meets  the  clearance 
requirements as specified in the installation manual.   

4.

 

Using  a  pencil,  center  punch  or  other  method,  mark  the  exact  center  point  of  each 
mounting hole on the enclosure.   Also mark the four corners of the section to be cut out. 

5.

 

Remove the stencil and using a pencil or other method, connect the marks you made at the 
corners of the cut out, forming a rectangle. 

6.

 

Using the jigsaw, cut the opening in the enclosure. 

7.

 

Using the # 29 drill bit, drill a hole at each of the mounting hole marks you made earlier. 

8.

 

Using the 8-32 tap, tap each of the holes you have drilled. 

 

2.4  INSTALLING THE AIR CONDITIONER 

INSTALL THE AIR CONDITIONER 

1.

 

Lay the air conditioner down with the cold side fan (side with the thermostat) facing up. 

2.

 

Take the supplied gasket and lay it down on the flange. 

3.

 

Take one of the supplied mounting screws and, from the under side of the flange, push it up 
through the top right mounting hole, and through the hole in the gasket.  The gasket hole is 
undersized and will hold the screw in place.  Repeat this on the top left mounting hole.   

4.

 

Set the AC unit in the hole you’ve cut in the enclosure, and using a screwdriver, carefully 
start the two screws you attached to the gasket to the tapped holes in the enclosure.  Do 
not tighten these at this time. 

5.

 

Install  the  rest  of  the  screws  in  the  flange  placing  a  nylon  washer  on  each  fastener  and 
screw them into the tapped holes in the enclosure.  Do not tighten them completely.  If you 
have  purchased  a  vertical  drip  pan,  you  will  need  to  install  the  three  long  screws  in  the 
three center holes in the bottom flange.   

6.

 

Remove the two starter screws and place a nylon washer on each and reinstall. 

7.

 

Tighten all screws. 

Содержание AAC-140B-4XT-EP

Страница 1: ...ermoelectric Air conditioner installation and operation manual FOR 400 Btu MODEL S AAC 140B 4XT EP AAC 140B 4XT HC EP Cooling Solutions for Mission Cooling Solutions for Mission Cooling Solutions for Mission Cooling Solutions for Mission Critical Electronics Critical Electronics Critical Electronics Critical Electronics ...

Страница 2: ...of the cabinet may be in outdoor atmosphere There is a barrier in the middle of the unit separating inside and outside sections The unit is intended to be permanently connected The unit meets the following standards ANSI ISA 12 12 01 2012 Nonincendive Electrical Equipment for Use in Class I and II Division 2 and Class III Division 1 and 2 Hazardous Classified Locations Dated 07 09 2012 UL 823 Issu...

Страница 3: ...TALLING THE AIR CONDITIONER 7 INSTALL THE DRIP PAN 9 APPLY POWER 9 3 OPERATION 3 1 THERMOSTAT SET POINTS AND HEATING COOLING UNITS 10 3 2 MAINTENANCE 10 EIC SOLUTIONS INC EIC SOLUTIONS INC EIC SOLUTIONS INC EIC SOLUTIONS INC 700 VETERANS WAY SUITE 200 WARMINSTER PA 18974 PHONE 1 215 443 5190 or 1 800 497 4524 FAX 215 443 9564 EMAIL info eicsolutions com VISIT US ON THE WEB AT www eicsolutions com ...

Страница 4: ...ng from consumer goods to spacecraft Your EIC Solutions Thermoelectric Air Conditioner operates on this principle so there is no compressor and no expensive ozone depleting CFC s EIC s air conditioners use Thermoelectric modules sandwiched between high performance aluminum heat sinks high CFM axial fans and a patented electronic design to pump the heat from the inside of your enclosure to the outs...

Страница 5: ...dirty environment 2 2 ORIENTATION Your AC unit can be mounted either vertically on the front rear or side of your enclosure See Figure 2 1 Vertically mounted 400 Btu units are always mounted with the exposed heatsink fins at the bottom and the fans at the top Fig 2 1 Vertical installations often require the use of a Condensate Drip Pan part DP 140V depending on a number of factors including intern...

Страница 6: ... INSTALLATION OF AAC 140B 4XT 400 BTU UNIT WITH DP 140V VERTICAL DRIP PAN AND DRAIN TUBE HOT SIDE OF AC OUTSIDE OF ENCLOSURE COLD SIDE OF AC INSIDE OF ENCLOSURE DRAIN TUBE ENCLOSURE DP 140V DRIP PAN HOT SIDE FAN COLD SIDE FAN HOT SIDE HEAT SINK FINS COLD SIDE HEAT SINK FINS ...

Страница 7: ...s of the section to be cut out 5 Remove the stencil and using a pencil or other method connect the marks you made at the corners of the cut out forming a rectangle 6 Using the jigsaw cut the opening in the enclosure 7 Using the 29 drill bit drill a hole at each of the mounting hole marks you made earlier 8 Using the 8 32 tap tap each of the holes you have drilled 2 4 INSTALLING THE AIR CONDITIONER...

Страница 8: ...8 8 8 8 1 800 497 4524 EIC SOLUTIONS INC 215 443 5190 FIG 2 3 2 800 3 000 3 000 2 800 2 800 2 800 0 175 0 175 11 250 5 250 ...

Страница 9: ...the outside APPLY POWER Once the air conditioner is mounted check the serial label and confirm the voltage required and then apply appropriate power as outlined below The unit is intended to be permanently connected Connect the wires to an appropriate power source using standard safe wiring methods Wire colors are as follows Black line White line neutral Green ground A wiring diagram is shown in F...

Страница 10: ... a unit is installed in an extremely dirty environment In these cases the hot side heat sinks outside the enclosure should be inspected regularly for a build up of dust or dirt If a build up is present on the heat sink fins it can be easily removed as follows 1 Disconnect the power from the unit 2 Dry dust dirt can be removed using compressed air to blow out the heat sinks Do not direct any high p...

Отзывы: