background image

EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde

9

2.4. Combustion air regulation

Kanuk® hot-air kilns are fitted with primary

(image B) and secondary (image A) air vents

for combustion air supply. During heating up

and use with nominal heat output, the primary

and secondary air vent in the rear wall must be 

opened. The primary air vent (imageB) is prima-

rily meant for pane ventilation and ought to be 

closed partially or fully only for incandescence.

By closing the secondary air vent in 

the rear wall, the combustion air ven-

tilation will be choked. This can result in higher emission rate. 

The secondary air vents cannot be closed fully for safety reasons.

2.5. Heating up

Fully open the control valve in the exhaust gas stub, the primary air vent in the 

combustion chamber door, and the secondary air vent in the rear wall. For hea-

ting up, stack the firewood in a pyramid over screwed paper and cover it in thin 

logs of wood. Then start the fire. After heating up, fill up the Kanuk® hot-air kiln 

with logs according to chapter 2.1.

Before the first heating-up, make sure to check the correct installation of the vie-

wing window of the Kanuk® hot-air kiln. The screws for the hanger on the front 

side of the combustion chamber door must be tightened to the degree that the 

door remains movable (hand-tight).

Note: 

Kanuk® hot-air kilns are coated in high quality heat-resistant 

paint. During the first phase of heating up, the burn-in of the paint may 

result in slight smoke development and odor nuisance. Make sure to 

keep your windows and doors open when heating up the kiln for the 

first time.

DIRECTIONS OF USE

Note: 

For the protection of the stove you should pay attention to the 

fact, that the stove is loaded moderately with firewood, so that the steel 

can distend steadily. Because of the amazing temperature differences 

between the ambiant temperature and the temperature within the sto-

ve, there may be crackling noises withing the Kanuk®.

Содержание Kanuk 3

Страница 1: ...Kanuk 3 4 Classic with hotplate und Turbo 1 2 Manual Brilliantly simple simply brilliant...

Страница 2: ...ring incidents safe decommissioning 2 8 Refilling 2 9 Bed of ashes 2 10 Cleaning 3 Guarantee 3 1 Guarantee Warranty 4 Kanuk Turbo additional information Thank you for choosing a Kanuk hot air kiln We...

Страница 3: ...hotplate Kanuk Turbo 4 8 7 1 2 3 6 5 1 1 General requirements Structure and components of the Kanuk Kiln shell 1 Door with special Schott Robax glass 2 Door locking mechanism 3 Gas flue pipe 4 Ash cat...

Страница 4: ...onstructionmanual accessories Ashcatchplate Remove the ash catch plate from its packaging and clip it into the bolt underneath the door from the top KilnshelloftheKanuk Classic StepI Push the hangers...

Страница 5: ...e top and push it into the torsion spring The medium hanger of the spring will be fixed on the doorframe The ends of the springs are to be fixed behind the door suspension Now return the bolt to the p...

Страница 6: ...te back Kanuk 3 Classic 80 cm 50 cm 80 cm 40 cm Kanuk 4 Classic 80 cm 55 cm 90 cm 40 cm Kanuk 3 with hotplate 80 cm 50 cm 80 cm 40 cm Kanuk 4 with hotplate 80 cm 55 cm 90 cm 40 cm forward from the sid...

Страница 7: ...36 Minimal chimney draft in Pa 12 12 12 12 12 12 HP with hotplate Table 2 Combustion chamber performance data Kanuk model 3 Classic 4 Classic 3 HP 4 HP Turbo 1 Turbo 2 fuel consumption in kg h 7 8 6 7...

Страница 8: ...ays sawdust coal coke or similar combustibles 2 2 UseofKanuk Kanuk hot air kilns may only be used with combustion chamber door closed All Kanuk hot air kilns can be fitted with a self closing door mec...

Страница 9: ...up stackthefirewoodinapyramidoverscrewedpaperandcoveritinthin logs of wood Then start the fire After heating up fill up the Kanuk hot air kiln with logs according to chapter 2 1 Beforethefirstheating...

Страница 10: ...indowimmediately tomakesurethatthereisenoughfreshairavailable 2 8 Refilling Open the primary air vent in the combustion chamber door and the se condary air vent in the rear wall and set the control va...

Страница 11: ...ers get a two year guarantee In case of commercial use the gu arantee period is extended by 12 months Viewing panes and ceramic sealing cords are generally not included in the guarantee In case of dam...

Страница 12: ...than 4 m per kW heat out put Chimneys Kanuk Turbo wood burning stoves don t need an own chimney The fire rating results from DIN 13384 part 1 2 and 3 with the triplet shown in table 1 Kanuk Turbo wood...

Страница 13: ...the back of the Kanuk Turbo and it turns bet ween 1600 and 2000 m an hour The ventilator s power can be regulated stageless and it is possbile to con trol it additionnaly with the thermostat at the f...

Страница 14: ...fol ded spiral seam pipe There is also the possibility to use pipe bends T pieces Y pieces or similar connection pieces to forward the warm air Connection diameter Kanuk Turbo 1 315 mm diameter Kanuk...

Страница 15: ...EHV GmbH Entwicklung Herstellung Vertrieb Hauptstra e 131 01744 Dippoldiswalde 15...

Страница 16: ...GmbH Entwicklung Herstellung Vertrieb Hauptstra e 131 01744 Dippoldiswalde 16 EHV GmbH Entwicklung Herstellung Vertrieb Hauptstra e 131 01744 Dippoldiswalde EHV GmbH Hauptstra e 131 01744 Dippoldiswa...

Отзывы: