Installation FaQs
Which parts have been delivered?
• 3× frame profiles, loose,
with pre-mounted bracket
• 2× clamping brackets
• 2× angle brackets
• 4× M5 screws (S1)
Which fitting materials are used?
• The fitting materials are not included in the
scope of delivery!
• The selection of the fitting materials is
based on the mounting bases on hand, the
load-bearing capacities of which are to be
checked before the installation. observe
without limitation the regulations of the
manufacturers of dowel and fitting materials.
WarNINg
Danger of injury/property damage
caused by unsuitable fitting materials
the fitting materials are to be selected
in accordance with the load-bearing ca-
pacity of the mounting bases.
How is the Z135 fast frame installed?
• The three frame profiles are put together
and bolted.
• The frame is aligned and fastened in the re
-
veal.
• The clip frames are clipped into the frame
profiles.
What is to be taken into account during the
function
check?
• The frame must be installed parallel and at
a right angle in the reveal to ensure that the
window shutters work perfectly.
Important notes