
EHC Fusion E10 Combi Series
Combination Boiler Range
Installation and
technical manual
THESE INSTRUCTIONS SHOULD BE READ CAREFULLY AND
RETAINED FOR FUTURE REFERENCE.
The Fusion E10 must be installed by a competent person with accordance
with this installation manual and all relevant regualtions in force at time of
installation
The Fusion E10 combination unit’s Unvented Cylinder is a controlled service
as defined in the latest edition of the building regulations.
The relevant regulations are:
England and Wales – Building Regulation G3
Scotland – Technical Standard P3
N Ireland – Building Regulation P5
After installation the Benchmark log table on page X must be completed
and left with the householder for future reference.
The Electric Heating Company Ltd
Unit 40, Block 5, Third Road, Blantyre Industrial Estate, Blantyre, Glasgow, G72 0UP
Tel. 01698 820533
Fax. 01698 825697
www.electric-heatingcompany.co.uk