![EGR TC0194 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/egr/tc0194/tc0194_installation-instructions-manual_2368356005.webp)
SIDE VIEW
FIG. 8
FIG. 7
FIG. 6
REMOVE THE MASKING TAPE FROM THE INSIDE OF THE SIDE RAILS ONLY. APPLY RUST INHIBITOR TO ALL THE DRILLED HOLES.
FIG. 5
TC0194
MITSUBISHI L200 3 PIECE TONNEAU COVER
17/11/09
Page 5 of 13
REMOVE MASKING TAPE
APPLY RUST INHIBITOR
1
2
22
22
CENTRE PUNCH THE TWO (2)
FRONT
HOLE POSITIONS AND DRILL
Ø5MM
HOLES. CENTRE PUNCH THE TWO (2)
REAR
HOLE POSITIONS AND DRILL
Ø6MM
HOLES. REPEAT FOR THE OTHER SIDE OF THE VEHICLE.
CENTRE PUNCH,
THEN DRILL Ø5MM
HOLES
CENTRE PUNCH,
THEN DRILL Ø6MM
HOLES
Ø5mm
Ø6mm
20mm
ENSURE BRACKET IS
PARALLEL WITH
TOP OF SIDE RAIL
ALIGN HOLES
A
B
7
8
9
20
10mm
Ø5mm
1
MARK, CENTRE PUNCH,
DRILL Ø5mm HOLE
APPLY RUST INHIBITOR
2
16
4
16
10
3
ATTACH LOCK STRIKER BRACKETS, ENSURING BRACKETS ARE PARALLEL WITH TOP OF SIDE RAIL. TIGHTEN TO TORQUE 12Nm.
POSITION LOCK STRIKER SUPPORT BRACKET UNDER THE LOCK STRIKER BRACKET AND ALIGN THE HOLES CLOSEST TO THE
FRONT OF THE VEHICLE AS SHOWN. MARK AND CENTRE PUNCH HOLE POSITION IN THE SIDE OF THE TUB. DRILL Ø5mm HOLE
AND APPLY RUST INHIBITOR. ATTACH LOCK STRIKER SUPPORT BRACKET TO THE TUB WITH A RIVET.