5.3.3
HANDLING
Due to its heavy weight, 4 (four) lifting hooks are provided on the top of the Power Cabinet as indicated on Figure
8.
Never try to move the power cabinets by using tools under panels; this will create a risk of
deformation.
Figure 8 - EFAPOWER EV-QC45
lifting hooks
After
the
power
cabinet
is
placed
, the
lifting
hooks
must be
removed
, and the M12
sealing
screws
must be
inserted
in their holes in order
to
guarantee
the
IP54
,
IK10
(
NEMA 3R
) protection degree.
5.3.4
ASSEMBLY/ PLACING INSTRUCTIONS
5.3.4.1
ANCHORING TO THE CONCRETE PAD
The Quick Charging Station must be anchored on the surface compliant with the specifications mentioned in
chapter 5.2.2.
The pow
er cabinet must be installed on a concrete pad using 4 (four) chemical anchors, M8 (5/16’’),
10mm thread
diameter
–
length must comply with local codes, but must have at least 120mm (5”).
In the following figure, some details are shown regarding the drilling layout for the Power Cabinet.
Only
4
(four)
points
are
needed
to
anchor
the
Unit
on the concrete pad (marked with a red circle).
For the power cabinet, the conduits
must extend 160mm (6.3”) above the concrete, or according to local codes.
The
cable entrance shall only be located as shown in the image below
(marked in green).