
PROFIVE® NUCE_C 25 W
Hardware Reference Manual – P – Revision 1
E.E.P.D. GmbH | Gewerbering 3 | 85258 Weichs
Copyright ©2020|2021 E.E.P.D. GmbH.
All rights reserved.
15
10/2021 Revision 1.7
Mechanical Mounting
Fig. 9: Mechanical Mounting
Please use the 4 prepared mounting points (red outline) to
fasten the base board in order to prevent short circuits.
Use 15.24 mm (0.6 inches) distance bolts for a stable mounting
of the board.
Do not disassemble the cooling solution, this will void the
warranty.
The illustration shows an example of a variant with active
cooling.
A
ss
e
mb
ly