A301-51-880 Issue T

Figure 9 - EH4200/EH4200IND dimensions (mm)

1. Lifting-bolts

EH4200

EH4200IND

A

1380

1428

B

120

220

C

470

523

D

260

311

E

200

240

A301-51-880 Issue T

Page 24

© Edwards Limited 2007. All rights reserved.

Edwards and the Edwards logo are trademarks of Edwards Limited.

T

e

c

h

n

ic

a

l D

a

ta

Figure 10 - EH4200C/EH4200 T3/EH4200 T160/T4 dimensions (mm)

1. Lifting-bolts

© Edwards Limited 2007. All rights reserved. 

Page 25

Edwards and the Edwards logo are trademarks of Edwards Limited.

In

st

a

lla

ti

o

n

A301-51-880 Issue T

3

Installation

3.1

Safety

z

A suitably trained and supervised technician must install your EH pump.

z

Ensure that the installation technician is familiar with the safety procedures which relate to the products 
pumped. Wear the appropriate safety-clothing when you come into contact with contaminated components. 
Dismantle and clean contaminated components inside a fume-cupboard.

z

Consult Edwards publication P400-40-100 (Vacuum pump and vacuum system safety - chemical and industrial 
systems) before you install and use the EH pump to process hazardous or flammable materials.

z

Vent and purge the pumping system before you start installation work.

z

Check that all the required components are available and of the correct type before you start work.

z

Ensure that debris does not get into the EH pump when you install it.

z

Disconnect the other components in the pumping system from the electrical supply so that they cannot be 
operated accidentally.

z

Do not reuse ‘O’ rings and Co-Seals.

z

Ensure that the cooling-air flow through the pump-motor cooling-fan cannot be obstructed.

z

Ensure that all electrical cables, nitrogen pipelines and cooling-water pipelines are safely positioned, 
secured and routed, so that they do not present a trip hazard.

z

Provide adequate access to all pump servicing points and oil-level sight-glasses.

z

Leak-test the system after installation work is complete and seal any leaks found to prevent leakage of 
hazardous substances out of the system and leakage of air into the system.

3.2

System requirements

Consider the following points when you design your pumping system:

z

You must use a suitable backing pump: refer to 

Section 2.1

 and 

2.2

.

z

The EH pump must be mounted on a firm, level surface.

z

Vacuum pipelines must be adequately supported to stop the transmission of stress to pipeline joints.

z

If necessary, incorporate flexible pipelines in your system pipelines to reduce the transmission of vibration 
and to prevent loading of the coupling joints. If you use flexible pipelines, you must ensure that you use 
flexible pipelines which have a maximum pressure rating which is greater than the highest pressure that can 
be generated in your system. 

z

You must limit the temperature of the inlet gas to be no greater than the temperature classification of the 
system (if applicable).

z

Ensure that your design incorporates all appropriate safety precautions if toxic, inflammable or explosive 
gases or particulates will be pumped.

WARNING

Obey the safety instructions listed below and take note of appropriate precautions. If you do not, 
you can cause injury to people and damage to equipment.

A301-51-880 Issue T

Page 26

© Edwards Limited 2007. All rights reserved.

Edwards and the Edwards logo are trademarks of Edwards Limited.

In

st

a

lla

ti

o

n

z

You must be able to purge with an inert gas when you shut down the pumping system to dilute dangerous 
gases to safe concentrations. Consult Edwards or your supplier if you are in doubt.

If the EH pump is to be fitted in a new system, ensure that all preliminary pipelines have been installed and that a 
suitable base for the EH pump has been prepared before you start installation. 

Check that the following services and facilities are available for connection to the EH pump:

z

Cooling-water supply and return

z

Hydrokinetic drive/gearbox purge nitrogen supply (chemical and ATEX compliant EH pumps only)

z

Electrical supply

z

Exhaust-extraction system

z

Inlet-screen (if required, to prevent the ingress of debris during commissioning): refer to 

Section 1.3.6

3.3

Unpack and inspect

Use the following procedure to unpack and inspect the EH pump:

1. Place the pallet in a convenient position with a fork lift truck or a pallet truck.

2. Remove all packing materials.

3. Use suitable lifting-gear to remove the EH pump from its pallet: 

z

On all pumps, attach the lifting-gear to the centre pair of lifting-bolts (

Figure 1

 to 

10

, item 1) on the EH 

pump.

z

All of the EH2600 model pumps and EH4200C, EH4200 T3X and EH4200 T160/T4X pumps have centres of mass 
which are offset towards the motor. On these pumps, you must fit an additional support strap to the motor 
(behind the lifting-bolt) to support the pump, and prevent it from tilting when you lift it.

Do not try to lift the EH pump by hand (see 

Section 2.4

 for the mass of your EH pump).

4. Remove all protective covers and inspect the EH pump. If the EH pump is damaged, notify your supplier and the 

carrier in writing within three days; state the Item Number of the EH pump together with your order number and 
your supplier’s invoice number. Retain all packing materials for inspection. Do not use the EH pump if it is 
damaged.

5. If the EH pump is not to be used immediately, refit the protective covers. Store the EH pump in suitable 

conditions as described in 

Section 6.1

.

WARNING

Use suitable lifting equipment to move the EH pump, in accordance with the method described 
below. If you do not, you can injure yourself or damage the EH pump. Refer to 

Section 2.4

 for the 

mass of the EH pump.

Содержание EH1200

Страница 1: ...3 Installation 25 3 1 Safety 25 3 2 System requirements 25 3 3 Unpack and inspect 26 3 4 Fill the pump with oil 27 3 4 1 Hydrokinetic drive gearbox 27 3 4 2 Shaft seal reservoir 27 3 4 3 Gear cover a...

Страница 2: ...highlighted as WARNING and CAUTION instructions you must obey these instructions The use of WARNINGS and CAUTIONS is defined below CAUTION Cautions are given where failure to observe the instruction c...

Страница 3: ...s The fluid coupling is viscosity sensitive The two versions of the EH pump for hydrocarbon and PFPE oils have fluid coupling drives which are specifically designed for the type of oil used in the pum...

Страница 4: ...rges when the gas pumped contains droplets or particles Always ensure that the pump is earthed so there is no danger of igniting flammable gases due to electrostatic discharges WARNING Misuse of the c...

Страница 5: ...elow and refer to motor rating plate Pump s 220 V 50 Hz 240 V 50 Hz 380 V 50 Hz 415 V 50 Hz 208 V 60 Hz 230 V 60 Hz 460 V 60 Hz EH250 EH500 Full load A Rating kW 6 3 1 5 5 8 1 5 3 7 1 5 3 4 1 5 6 1 1...

Страница 6: ...g coils After cooler and swept volume Headplate jointing compound All EH1200 EH2600 and EH4200 models All EH2600 and EH4200 models Grey cast iron grade 250 BS1452 SG iron grade 420 12 BS2789 Aluminium...

Страница 7: ...200 T3 T160 T4 dimensions mm 1 Lifting bolts A EH1200C 250 EH1200 T3 T160 T4 208 Edwards Limited 2007 All rights reserved Page 21 Edwards and the Edwards logo are trademarks of Edwards Limited Technic...

Страница 8: ...ve a maximum pressure rating which is greater than the highest pressure that can be generated in your system z You must limit the temperature of the inlet gas to be no greater than the temperature cla...

Страница 9: ...in ATEX certified systems Connect the cooling water supply and return lines to the 3 8 inch BSP connectors One connector is on the rear of the hydrokinetic drive gearbox the other connector is on the...

Страница 10: ...d Edwards and the Edwards logo are trademarks of Edwards Limited Installation Figure 12 Example control circuit 1 Electrical supply isolator 2 ve control side 3 Thermistor relay 4 Stop switch 5 Start...

Страница 11: ...ote The thermistor terminals may be annotated T1 and T2 instead of P1 and P2 A301 51 880 Issue T Page 38 Edwards Limited 2007 All rights reserved Edwards and the Edwards logo are trademarks of Edwards...

Страница 12: ...he flange on the underside of the EH pump is blanked off If you do not wish to use the side outlet remove the blanking plate and O ring from the outlet on the underside of the EH pump and refit the bl...

Страница 13: ...Dispose of components and waste oil safely see Section 6 2 z Take care to protect sealing faces from damage z Do not touch or inhale the thermal breakdown products of fluorinated materials which may b...

Страница 14: ...51 880 Issue T Page 48 Edwards Limited 2007 All rights reserved Edwards and the Edwards logo are trademarks of Edwards Limited Maintenance 5 6 Lubricate the rear bearing All EH250 and EH500 model pump...

Страница 15: ...e state for each part required z Model and Item Number of your equipment z Serial number if any z Item Number and description of part 7 2 Service Edwards products are supported by a world wide network...

Отзывы: