INSTRUCTION AND
SECURITY MANUAL
MAJ - 05/18
LOADING CONFIGURATIONS
HORIZONTAL CEILING - SLOPING CEILING AND HORIZONTAL WALL SETTING
Open the feet as much as possible and insert
each removable pin in the 3rd hole of the
base frame.
Insert the arms in the
horizontal tubes, the
retractable pin must be
locked in the selected hole.
Turn the steering wheel while pushing the main brake lever to lift the board up to the ceiling.
Once the board loaded(*), position the EDMAPLAC® MEGA along the wall. Pull out the removable pin from the
top rack in order to angle the board completely, while pushing the EDMAPLAC® MEGA along the wall thanks to
the top rack handle. Lock the 2 wheel brakes. We advise to not exceed a loading weight of 32 kg (71 lbs) for
this setting.
(*)Always ensure that board is correctly centered on the panel lifter head.
Once the board loaded(*), pull the
top rack handle to put the board in
horizontal position.
Position the panel lifter with the
steering wheel in front of the wall
to lift the board along the wall.
(*)Always ensure that board is
correctly centered on the panel
lifter head.
Once the board loaded(*),
pull out the removable pin to
unlock the top rack, then pull
the handle to angle the board.
Insert the removable pin in the
sloping ceiling position hole (45°
position). The top rack position is
adjusted according to the ceiling
angle while the board is touching
the ceiling.
(*)Always ensure that board is
correctly centered on the panel
lifter head.
1
2
3a
3b
4
5
CEILING SETTING
HORIZONTAL SLOPING CEILING
HORIZONTAL WALL SETTING
Ref. 267455