26
TP-00347-01
Chapter 2: Installation
Installation Procedure
To install a power supply:
S
TEPS
1.
Locate the power supply bay on the lower left side of the rear panel of the library.
2.
If present, loosen the screws and remove the power supply bay cover.
3.
Before installing the power supply, inspect its connectors. Ensure that the connectors are
intact, free of any foreign objects, and have no cracks or deformed or bent contacts.
4.
Insert the power supply on the alignment rails and push it into the bay until it seats itself
against the back of the library.
5.
Tighten the blue captive screws with your fingers to secure the power supply to the library.
Cable Connections
Power Cord Connections
Mains voltages are present on this equipment. Before connecting a power cord
to the library:
Ensure that the power cord meets safety standards for the country where the
equipment is installed.
Use cable rated at 13A to avoid overheating the cord.
Always observe the Safety Warnings and Cautions described on
To connect the power cord to the library:
Содержание 24Q
Страница 1: ...24Q Ark Tape Library 48Q Ark Tape Library Setup and User s Guide ...
Страница 37: ...TP 00347 01 37 Operator Control Panel OCP Main Menu Main Menu ...
Страница 38: ...38 TP 00347 01 Chapter 4 Operation Information Menu Information Menu 1 of 2 ...
Страница 39: ...TP 00347 01 39 Operator Control Panel OCP Information Menu 2 of 2 ...
Страница 40: ...40 TP 00347 01 Chapter 4 Operation Commands Menu Commands Menu ...
Страница 41: ...TP 00347 01 41 Operator Control Panel OCP Configuration Menu Configuration Menu ...
Страница 42: ...42 TP 00347 01 Chapter 4 Operation Service Menu Service Menu 1 of 2 ...
Страница 43: ...TP 00347 01 43 Operator Control Panel OCP Service Menu 2 of 2 ...
Страница 70: ...70 TP 00347 01 Chapter 4 Operation ...
Страница 106: ...106 TP 00347 01 Chapter 7 Specifications ...
Страница 110: ...110 TP 00347 01 Chapter 8 Regulatory Information ...
Страница 111: ......
Страница 112: ...TP 00347 01 ...