background image

 

 

I-3. LED Status 

 

Function 

Color 

Status 

Description 

LINK/ACT 

Green

/

Amber

 

On 

Port is connected 

Off 

Port is disconnected or link failure 

Flashing 

Sending or receiving data 

PWR 

Green 

On 

Power on 

Off 

Power off 

 

 

II.

 

Hardware Installation   

 

This section will guide you through the steps to set up the GS-1005E and 

GS-1008E V2. 

1. Plug power adapter into a wall outlet.

 

NOTE: Ensure the “PWR” LED lights on

 

Green. 

2. Plug an Ethernet cable from the LAN port to the router. 

NOTE: Ensure the “LAN” LED lights on

 

Green. 

3. Plug an Ethernet cable from the LAN port to any devices that have 

Ethernet port. 

 

 
 
 
 
 

 

 

Отзывы: