E
QUIPMENT
C
HECKLIST
3-3
Equipment Checklist
After unpacking the switch, check the contents to be sure you have
received all the components. Then, before beginning the installation, be
sure you have all other necessary installation equipment.
Package Contents
•
**!"#$%&''$()*+,-+.&!*/0
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
• Power Cord
• RS-232 console cable
• This Installation Guide
• Management Guide CD
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following
equipment available:
• Four mounting screws for each device you plan to install in a rack—these
are not included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
Содержание EdgeConnect 2402PoE
Страница 10: ...TABLE OF CONTENTS xvii Management Features C 3 Standards C 3 Compliances C 3 Glossary Index...
Страница 13: ...xx...
Страница 28: ...NETWORK PLANNING 2 8...
Страница 38: ...INSTALLING THE SWITCH 3 10...
Страница 50: ...MAKING NETWORK CONNECTIONS 4 12...
Страница 62: ...SPECIFICATIONS C 4 Safety UL CUL UL 60950 1 CSA 22 2 NO60950 1 TUV GS EN60950 1 CB IEC60950 1...
Страница 68: ...Glossary 6...
Страница 71: ...INDEX Index 3 W Web based management 1 3...