
C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 38 –
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
◆
50-Port Layer 2 Gigabit Ethernet Switch (ECS2000-50T)
◆
Four adhesive foot pads
◆
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
◆
Power Cord
◆
This Installation Guide
◆
Documentation CD (includes Management Guide)
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
◆
Four mounting screws for each device you plan to install in a rack—these
are not included
◆
A screwdriver (Phillips or flathead, depending on the type of screws used)
Содержание ECS2000-50T
Страница 1: ...Installation Guide www edge core com ECS2000 50T 50 Port Layer 2 Gigabit Ethernet Switch...
Страница 2: ......
Страница 4: ......
Страница 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Страница 16: ...ABOUT THIS GUIDE 16...
Страница 19: ...CONTENTS 19 INDEX 64...
Страница 20: ...CONTENTS 20...
Страница 22: ...TABLES 22...
Страница 29: ...CHAPTER 1 Introduction Overview 29...
Страница 63: ...GLOSSARY 63...
Страница 65: ...INDEX 65...
Страница 66: ......
Страница 67: ...ECS2000 50T E092012 MW R01...