C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 36 –
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
◆
Web Smart 26-Port GE Switch
◆
Four adhesive foot pads
◆
Grounding screw
◆
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
◆
Power Cord
◆
This Installation Guide
◆
Documentation CD (includes Management Guide)
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
◆
Four mounting screws for each device you plan to install in a rack—these
are not included
◆
A screwdriver (Phillips or flathead, depending on the type of screws used)
Содержание ECS2000-18P
Страница 1: ...INSTALLATION GUIDE EZ SwitchTM 10 100 1000 Web Smart 26 Port Gigabit Ethernet Switch SMCGS26C Smart...
Страница 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Страница 16: ...ABOUT THIS GUIDE 16...
Страница 20: ...TABLES 20...
Страница 27: ...CHAPTER 1 Introduction Overview 27...
Страница 61: ...GLOSSARY 61...
Страница 63: ...INDEX 63...
Страница 64: ......