Edge-Core AS6700-32X Скачать руководство пользователя страница 34

Chapter 5

  |  Switch Management

Understanding the Switch Status LEDs

–  34  –

Understanding the Switch Status LEDs

The switch includes LED indicators on the front panel that display system and port 
status. Understanding the LED states will help you monitor switch operation and 
alert you to any problems.

Figure 17:  System and Port Status LEDs

Management Port Link LED

Lower QSFP+ Port LED

Management Port Activity LED

System LED

Upper QSFP+ Port LED

Alarm LED

Table 5: System Status LEDs

LED

Condition

Status

Alarm

On Green

The system is operating normally.

Flashing Red

The system detected a fault; either a PSU, fan, or thermal 
condition.

Sys

On Green

Power is on and the system is operating normally.

Flashing Green

The system is booting-up.

On Amber

The system has been reset.

Off

There is no power being received.

Table 6: Management Port Status LEDs

LED

Condition

Status

Left LED (Link)

On Green

Port has a valid link. 

Off

The link is down.

Right LED (Activity)

Flashing Green

Activity on the port.

Off

The link is down.

5

6

1

2

3

4

1

4

2

5

3

6

Содержание AS6700-32X

Страница 1: ...Installation Guide www edge core com AS6700 32X AS6701 32X 32 Port 40G Data Center Switch...

Страница 2: ...Installation Guide AS6700 32X AS6701 32X 32 Port 40G Data Center Switch with 20 40G QSFP Ports 2 40G Expansion Slots 2 Power Supply Units and 5 Fan Trays F2B or B2F Airflow E022014 CS R01...

Страница 3: ...ely and ensure trouble free operation it is recommended that you read each chapter of this guide in sequence while installing the switch The guide includes these chapters Chapter 1 Switch Description...

Страница 4: ...owing document Quick Start Guide Safety and Regulatory Information Conventions The following conventions are used throughout this guide to show information Note Emphasizes important information or cal...

Страница 5: ...erview 16 Package Contents 16 General Installation Guidelines 17 Installation Precautions 17 Switch Installation Tasks 18 3 Switch Chassis 19 Rack Mount Guidelines 19 Rack Cooling 20 How to Install th...

Страница 6: ...t Connections 41 Cable Labeling and Connection Records 41 Copper Cabling Guidelines 42 10 100BASE TX Pin Assignments 43 1000BASE TPin Assignments 43 Fiber Cabling Guidelines 44 How to Connect to Twist...

Страница 7: ...re 12 6 Port 40G QSFP Module 25 Figure 13 Installing an Expansion Module 26 Figure 14 AC Power Supply Unit 27 Figure 15 Grounding Terminal 29 Figure 16 AC PSU and Power Connection 30 Figure 17 System...

Страница 8: ...e 7 QSFP Port Status LEDs 35 Table 8 Power Supply Unit Status LED 35 Table 9 Fan Tray Status LED 36 Table 10 Console Cable Wiring 37 Table 11 Maximum Twisted Pair Copper Cable Lengths 42 Table 12 10 1...

Страница 9: ...hat run Edge Core s Data Center Switch Software DCSS and those that use the Open Network Installer Environment ONIE which supports the installation of compatible independent network operating system N...

Страница 10: ...h supports indicator LEDs for displaying port status Console Port The RJ 45 connector on the front panel labeled Console provides an out of band serial connection to a terminal or a PC running termina...

Страница 11: ...r supply units PSUs You can install up to two PSUs with matching airflow direction in the switch Grounding Terminal The switch supports a single screw grounding terminal The grounding terminal must be...

Страница 12: ...Diagnostic PS1 PS2 Power FAN LOC Ports 1 20 Status link activity OOB RJ 45 Status link activity Power Supply Unit Rating 100 240 VAC 50 60 Hz 6 0 3 0 A Power Consumption 375 Watts maximum 267 Watts t...

Страница 13: ...top of rack switch or as part of a distributed spine network providing full line rate switching at Layer 2 or Layer 3 across all ports Figure 3 Cloud Data Center Deployment In many data center configu...

Страница 14: ...Sel ect Act Fdx 100 Swi t chEngi neFai l Sel fTest A 1X Li nk Mode 2X 3X 4X 5X 7X 6X 8X A 1X Li nk Mode 2X 3X 4X 5X 7X 6X 8X A 1X Li nk Mode 2X 3X 4X 5X 7X 6X 8X A 1X Li nk Mode 2X 3X 4X 5X 7X 6X 8X...

Страница 15: ...have a back to front B2F airflow direction the top of rack switch includes two fan trays that reverse the airflow direction through the switch This enables flexible deployment options for the switch...

Страница 16: ...on page 18 Package Contents After unpacking the switch check the contents to be sure you have received all the components AS6700 32X or AS6701 32X Data Center Switch Rack Mounting Kit contains two st...

Страница 17: ...ts for the switch can be met as listed under Power Supply Units on page 27 Installation Precautions Warning This switch uses lasers to transmit signals over fiber optic cable The lasers are compliant...

Страница 18: ...eceived all the items Package Contents on page 16 Install the Chassis Be sure to plan you rack installation taking into account switch cooling requirements Install any optional expansion modules in th...

Страница 19: ...ability Whenever possible secure the rack to the building ceiling or floor particularly if you are located in a region where earthquakes are common Rack Planning When installing equipment in a rack fi...

Страница 20: ...the airflow When possible do not completely fill the rack or cabinet with equipment allow some unused space within the enclosure for better airflow How to Install the Switch in a Rack Before you star...

Страница 21: ...ck so that it is aligned with the marked holes 4 The second person should secure the switch in the rack using four rack mounting screws not provided Figure 8 Installing the Switch in a Rack 5 If insta...

Страница 22: ...tch If the air flow is insufficient it may cause the switch to overheat and possibly fail The switch includes five removable fan trays located in the rear of the switch The fan tray options may have e...

Страница 23: ...of the fan tray is indicated by labels attached to the fan tray see Figure 10 on page 23 Caution All installed fan trays must have a matching airflow direction Installing a front to back F2B tray wit...

Страница 24: ...ay 1 Loosen the retaining screw on the front panel of the fan tray 2 Pull firmly on the fan tray handle until the fan tray is free 3 Slide the fan tray out of the switch 4 Insert the replacement fan t...

Страница 25: ...Module Caution It is recommended to use an ESD wrist strap during installation Note The slide in modules are hot swappable you do not need to power off the switch before installing or removing a modul...

Страница 26: ...he module level guide it into the carrier rails on each side and gently push it all the way into the slot ensuring that it firmly engages with the connector 5 If you are sure the module is properly ma...

Страница 27: ...ovide 1 1 redundancy Note 1 1 redundancy is a system where a switch power supply is backed up by another switch power supply in a load sharing mode If one power supply fails the other power supply tak...

Страница 28: ...0 Watts maximum Maximum Current 6 0 A 100 VAC 3 0 A 240 VAC Size W x D x H 54 5 x 240 x 40 mm 2 15 x 9 45 x 1 57 inches Table 4 Power Supply Unit LED LED Condition Status PSU LED On Green External AC...

Страница 29: ...afety requirements Figure 15 Grounding Terminal Before powering on the switch ground the switch to earth as described below 1 Ensure that the rack on which the switch is to be mounted is properly grou...

Страница 30: ...he switch unit To connect the switch to a power source 1 Install one or two AC PSU units Slide them into the PSU slots at the rear of the switch until they click into place Push the release lever to r...

Страница 31: ...cord directly into the socket on the AC PSU 4 Check the LED indicators on the PSU and switch front panel as the unit is powered on to verify that power is being received If not recheck the PSU and pow...

Страница 32: ...Chapter 4 Power and Grounding How to Connect to AC Power 32...

Страница 33: ...ation for details on available options and set up for ONIE The DCSS switch models include a management agent that allows you to configure or monitor the switch using its embedded management software T...

Страница 34: ...em LED Upper QSFP Port LED Alarm LED Table 5 System Status LEDs LED Condition Status Alarm On Green The system is operating normally Flashing Red The system detected a fault either a PSU fan or therma...

Страница 35: ...links over a breakout cable Flashing indicates activity on the links Off There are no links on the port Power Status LED Table 8 Power Supply Unit Status LED LED Condition Status Status On Green Exte...

Страница 36: ...itch Status LEDs 36 Figure 19 Fan Tray Status LED Fan Tray Status LED Table 9 Fan Tray Status LED LED Condition Status Status On Green Fan tray is operating normally On Red Fan tray has a fault Off No...

Страница 37: ...t to notebooks or other PCs that do not have a DB 9 COM port use a USB to male DB 9 adapter cable not included with the switch Figure 20 Console Port The following table describes the pin assignments...

Страница 38: ...o the Console port on the switch 3 Configure the PC s COM port required settings using VT 100 terminal emulator software such as HyperTerminal running on the management PC 4 For switches running DCSS...

Страница 39: ...over Ethernet access to the switch s configuration To prevent unauthorized access it is recommended that it only be connected to a secure private network Figure 22 Management Port Connection Follow t...

Страница 40: ...te the NOS installer and then load the NOS software Follow these steps 1 If the NOS installer is located on a network server first connect the RJ 45 Management Mgmt port to the network using Category...

Страница 41: ...ll enable you to easily locate inter connected devices isolate faults and change your topology without need for unnecessary time consumption To effectively manage a network s physical deployment follo...

Страница 42: ...X or 1000BASE T operation Check the following criteria against the current installation of your network Cable type Unshielded twisted pair UTP or shielded twisted pair STP cables with RJ 45 connectors...

Страница 43: ...s be connected Note that for 1000BASE T operation all four pairs of wires are used for both transmit and receive Table 12 10 100BASE TX MDI and MDI X Port Pinouts Pin MDI Signal Namea a The and signs...

Страница 44: ...full duplex or in a four lane mode at 10 Gbps full duplex Note The length of fiber optic cable for a single switched link should not exceed the relevant standards specified in this section However pow...

Страница 45: ...cable Do not let fiber cables hang free supporting their own weight Do not let fiber cables pull in any way that puts stress on the connectors How to Connect to Twisted Pair Copper Ports Follow these...

Страница 46: ...to install a QSFP transceiver 1 Consider network and cabling requirements to select an appropriate transceiver type that is also compatible with the switch transceiver support 2 If the QSFP slot is co...

Страница 47: ...e that is not less than the recommended maximum operational temperature of the product You must also use an approved Laser Class 1 QSFP transceiver 1 Remove and keep the port s protective cover When n...

Страница 48: ...or connections within the data center A 40G DAC connection is also known as twinax copper or 10GBASE CR4 DAC copper cables are available in pre terminated fixed lengths up to 7 m 22 9 ft When operatin...

Страница 49: ...6 Port Connections DAC Connections 49 2 Plug the other end of the twinax cable into an SFP slot on the switch 3 Check that the Link LED on the switch turns on green to indicate that the connection is...

Страница 50: ...r cord and the wall outlet Check if the PSU LED is on red If required replace the PSU Contact your dealer for assistance Alarm LED is flashing Red Check for a fan tray failure If required replace any...

Страница 51: ...ronment where you are sure that all the other components are functioning properly In Band Access You can access the management agent in the switch through a connection to any port using Telnet a web b...

Страница 52: ...osing LED indicators 50 E electrical interference avoiding 17 equipment checklist 16 F fan tray 23 I in band access 51 indicators LED 34 installation power requirements 17 site requirements 17 install...

Страница 53: ...Index 53 surge suppressor using 17 W web based management 33...

Страница 54: ...AS6700 32X AS6701 32X E022014 CS R01...

Отзывы: