background image

Part #2930
Rev. 6/11- AJ/mc

Page 3 of 3

©2011 Edelbrock LLC

Brochure #63-0464

Edelbrock, LLC • 2700 California St. • Torrance, CA  90503

Tech-Line: 800-416-8628  •  Office Line: 310-781-2222

1)

Use only recommended intake gaskets set when installing this intake manifold.

2)

Fully clean the cylinder head intake flanges and the engine block end seal surfaces.

3)

Apply Edelbrock Gasgacinch sealant P/N 9300 to both cylinder head flanges and to the cylinder head side of the gaskets, allow to air dry, and
attach the intake gaskets.

4)

Do not use cork or rubber end seals. Use RTV silicone sealer instead. Apply a ¼" high bead across each block end seal surface, overlapping
the intake gasket at the four corners. This method will eliminate end seal slippage.

5)

Install the intake manifold and hold-down bolts. Torque all of the manifold bolts in two steps by the sequence shown in 

Figure 2

to 25 ft/lbs.

See Figure 6 for firing order.

INSTALLATION

Figure 5  - Intake Manifold Bolt Torque Sequence

Torque Bolts to 25 ft/lbs.

Firing Order: 1-8-4-3-6-5-7-2

Turn Distributor Counter-Clockwise to Advance Ignition Timing

Отзывы: