background image

©2006 Edelbrock Corporation
Rev. 5/06 - DA/mc

Catalog #65252, #65253

Brochure #63-65252

Page 2 of 2

HARDWARE SUPPLIED

Catalog #65252, #65253

Qty.

Description

Qty.

Description

1

#25-9253 Header left side (#65252) Ceramic

6

3/8” Flat washers

1

#25-9254 Header right side (65252) Ceramic

1

1/4 Hex capscrew

1

#25-9233 Header left side (#65253) Ti-Tech

6

3/8” Hex capscrews

1

#25-9234 Header right side (#65253) Ti-Tech

18 3/8” Lock washers

12

Hex header bolts

4

Hardened washers (for header flange slotted holes)

2

Port gaskets

6

3/8” Hex nuts

2

Donut gaskets

1

3/8” O.D. spacer

3

Wire ties

Edelbrock Corporation, 2700 California St., Torrance, CA 90503

Tech Line: (800) 416-8628

Office: (310) 781-2222

E-Mail: [email protected]

9. Re-install spark plug wires.
10. Re-fasten dip stick tube using spacer and bolt

supplied in kit (if needed).

11. Re-install air intake assembly.
12. With wire ties, route any hoses, wires or lines away

from headers as necessary.

Left Side

1. Disconnect spark plug wires from spark plugs.
2. Disconnect A.I.R. injection hose from exhaust

manifold check valve.

3. Disconnect E.G.R. tube from rear of manifold.

(Stock E.G.R. adapter fitting will be re-used.)

4. Disconnect temperature sensor wire.
5. Unbolt and remove manifold from top side.
6. Install flange gasket and one 3/8"-16 x 1" bolt, lock

washer, and flat washer at rearmost bolt hole (leave
bolt loose enough to accept Header).
NOTE: Thick washers are to be used on slotted
holes of port flange.

7. Install left side Header from top side.
8. Install all bolts and washers on left side (do not

tighten at this time).

9. Re-install E.G.R. tube to header using stock

adapter.

10. Align all parts and tighten left side flange bolts at

this time.

11. Remove A.I.R. check valve from manifold and install

on A.I.R. fitting of header.

12. Connect A.I.R. injection hose to check valve.
13. Re-install spark plugs wires.
14. Re-install temperature sensor wire to temperature

sensor.

ASSEMBLY OF EXHAUST PIPE

1. Using supplied hardware and new donut gaskets

on both sides, re-attach the factory extension pipes
to the headers, and tighten bolts evenly to ensure a
tight seal.

2. Re-connect O2 sensors. Route O2 sensor wire

from loom to O2 sensors away from exhaust
components.

FINAL INSPECTION

1. Check all lines (hydraulic, vacuum, air conditioning

and fuel) to ensure there is adequate clearance to
headers. Use wire ties as needed.

2. Re-connect battery.
3. At this point, it is a good idea to look everything

over and make sure that nothing was missed in
assembly.

4. Start vehicle and bring up to normal operating

temperature. Check for possible leaks.

5. Turn engine off and let cool. Tighten all bolts again.

Отзывы: