SE-3 3-Channel Electrocardiograph Service Manual
-29-
4)
Place the paper and roller gently in the recorder with the roller pin on the roller
’
s left
side facing to the groove;
5)
Pull about 2cm of paper out, and put down the recorder casing;
6)
Secure the casing by pressing it firmly.
Loading/Replacing Process for Folded thermal paper:
1) Place fingers under the flange of the recorder casing, pull upwards directly to release
the casing;
2) Remove residual paper in the Paper Tray if necessary;
3) Take off the wrapper of folded thermal paper, and then put it in the Paper Tray with the
paper
’
s grid side facing the thermal print head while put the free end of paper upright;
4) Pull about 2cm of paper out, and put down the recorder casing;
5) Secure the casing by pressing it firmly.
6.3 Patient Cable Connection
WARNING
: The performance and electric shock protection can be guaranteed only
if original EDAN patient cable and electrodes are used.
Patient cable includes two parts, main cable and lead wires with associated connectors, which
can be distinguished from the color and identifier on the connectors.
Connect Main Cable:
Plug the connector of main cable into the patient cable socket on the right side of the unit
according to the direction of arrow on the plug, and then secure it with two screws.
Main Cable
Lead Wires
Connector
Screw
Electrode Connectors