Figure 26
Foam Tape Installation Against
Wall Sleeves
Foam 1/2" x 1/2"
Top Only
Foam 1/2" x 3/4"
Both Sides
INSTALLATION INSTRUCTIONS — R23C | R23H
• Remove 2-position connector assembly from kit
bag supplied with unit (2 yellow wires attached).
• Connect 2-position connector to 2-position
connection located on bottom of control box
panel.
7.
Field Install (Optional) Control
A. Remove black jumper wire located on bottom panel
of control box
(also terminated with 2-position
connector).
B. Cut jumper wire in middle and splice Control to
jumper.
C. Place connector back into original location. Refer to
wiring diagram on unit for details.
8.
Secure Chassis
• Verify all seals are properly located,
• correct baffles are attached to condenser coil,
and properly orientated,
• slide unit into final position and tighten tie down
bolts or screws as necessary.
9.
Hard-wired units — If unit is hard wired, follow
instructions on pages 40-44 to verify existing wiring
and over current protection.
A. Remove line cord wires from PTAC/PTHP power
entrance terminals.
B. Route power supply wiring through strain-relief
bushing and connect leads to power entrance
terminals.
C. Secure strain-relief clamp. (If wiring is through
conduit, insert conduit through control box
knockout and secure in place.)
D.
DO NOT
turn on power until completing instructions
in "Final Inspection and Startup" on
page 31.
10.
Do Not Plug Line Cord In, If In Used Condition.
Follow instructions in "Final Inspection and Startup".
P/N 240010329, Rev. A [10/15/2013]
23
Made in USA
Содержание RetroAire R11C
Страница 42: ...NOTES The Right Fit for Comfort 42 P N 240010329 Rev A 10 15 2013 ...
Страница 43: ......