ECR International UB90-125 Скачать руководство пользователя страница 13

13

Connections And Termination
To prevent damage to gas burner and ensure proper 

operation of unit, installer must clean and remove all 

shavings from interior of all PVC pipe used on air intake.

Boilers require dedicated direct vent system. All air for 

combustion is taken directly from outdoors through 

combustion air intake pipe. All fl ue products are discharged 

to outdoors through vent pipe.  Install vent system in 

accordance with these instructions.

Figures 8 and 9 

1. 

“Combustion Air and Vent Pipe 

Requirements, for standard two-pipe roof and sidewall 

terminations and Figures 10, 11, and 12 for concentric 

vent terminations (roof termination is preferred). 

Combustion air and vent pipes must terminate 

together in same atmospheric pressure zone as shown. 

Construction through which vent and air intake pipes 

may be installed is minimum ¼” and maximum 24” 

thickness.

Combustion air and vent pipe fi ttings must conform 

2. 

to one of the following American National Standards 

Institute (ANSI) and American Society for Testing and 

Materials (ASTM) standards:

Table 3 - Combustion air and vent pipe fi ttings 

must conform with the following:

Item

Material Standards

Vent Pipe 

and Fittings

PVC schedule 40

ANSI/ASTM D1785

PVC - DWV

ANSI/ASTM D2665

CPVC schedule 40

ANSI/ASTM D1784/

F441

SDR-21 & SDR-26 PVC

ANSI/ASTM D2241

ABS-DWV

ANSI/ASTM D2661

Schedule 40

ANSI/ASTM F628

Pipe 

Cement/

Primer

PVC ANSI/ASTM 

D2564

CPVC

ANSI/ASTM F493

Schedule 40 ABS

ANSI/ASTM D2235

IPEX is approved vent manufacturer in Canada listed 

• 

to  ULC-S636.
IPEX System 636 Cements and Primers are approved 

• 

in Canada listed to ULC-S636.

DO NOT USE CELLULAR (FOAM) CORE PIPE

WARNING

Use of cellular core PVC for venting fl ue gas could result 

in death, serious injury.

!

  

Combustion air and vent piping connections on boiler 

3. 

are 2”, but must increase to 3”. Due to potential for 

fl ue gas temperatures over 155°F, fi rst 5 feet of vent 

pipe must be CPVC (furnished), remaining vent pipe 

can be PVC.  If any elbows are employed within fi rst    

2 ½’ of vent, they must be CPVC. Two 30” pieces of 2” 

CPVC pipe and one 2” CPVC coupling are furnished with 

boiler. See Figure 13.

Length of pipe is counted from boiler jacket (air intake 

pipe) or from vent tee (vent pipe). First fi ve feet of “Total 

Equivalent Length” of vent pipe must be CPVC.  
Reduce maximum vent length 5 feet per each additional 

elbow.

Combustion air and vent piping to be pitched back to 

4. 

boiler at minimum ¼” per foot (21mm/m) from intake 

and vent terminals so that all moisture in combustion 

air and vent piping drains to boiler. Pipes must be 

pitched continuously with no sags or low spots where 

moisture can accumulate and block the fl ow of air 

or fl ue gas. Combustion air and vent pipes must be 

airtight and watertight.

 - Combustion Air & Vent Piping

Figure 13 

Combustion Air and Vent Pipe Equivalent Length

3 in. Pipe

Minimum Venting

3 in. Pipe

Maximum Venting

6 ft. (1.8 m) in length

60 ft. (18.3 m) in length and 

up to four (4) 90° elbows  

1 - 90° elbow = 5 ft (1.6 m)

1 - 45° elbow = 3.5 ft (1.1 m)

1- 2” x 3” adapter = 0 ft (0 m)

6 -  COMBUSTION AIR AND VENT PIPE

Содержание UB90-125

Страница 1: ...VENT CONDENSING HOT WATER BOILER INSTALLATION OPERATION MAINTENANCE MANUAL An ISO 9001 2008 Certified Company Models UB90 125 UB90 150 UB90 175 UB90 200 Manufactured by ECR International Inc 2201 Dwy...

Страница 2: ...ch if not avoided could result in death or serious injury DANGER Indicates a hazardous situation which if not avoided WILL result in death or serious injury IMPORTANT Read following instructions COMPL...

Страница 3: ...ertified in accordance with ANSI American National Standards Institute Z21 13 standards as gas fired direct vent condensing hot water boilers Heating Capacity indicates amount of heat available after...

Страница 4: ...0 187 700 187 250 165 700 163 600 140 700 140 100 119 150 116 750 4 000 183 600 183 000 162 600 159 800 137 600 136 800 117 200 114 000 5 000 179 500 178 750 159 500 156 000 134 500 133 500 115 250 11...

Страница 5: ...rvice by qualified professionals are required 2 SAFE INSTALLATION AND OPERATION Installers Follow local regulations with respect to installation of CO Carbon Monoxide Detectors Follow maintenance reco...

Страница 6: ...ce circulator replacement condensate trap control replacement etc Boiler must be located where ambient temperatures 8 minimum possible room temperatures where boiler is installed assuming boiler is no...

Страница 7: ...venting system common venting system should be resized to approach minimum size as determined using appropriate tables in chapter 13 of the National Fuel Code ANSI Z223 1 NFPA 54 Placing The Boiler Pl...

Страница 8: ...tructions Expansion Tank And Make Up Water Determine required system fill pressure design temperature and water content Boiler contains 2 6 gallons U S Size expansion tank accordingly Consult expansio...

Страница 9: ...f valve capacity stated on rating plate Run pipe as short and straight as possible to E location protecting user from scalding and properly drain piping Install union if used close to safety relief va...

Страница 10: ...ible Filling Condensate Trap With Water Manually fill condensate trap at initial start up with water Following steps are required to fill condensate trap for start up Steps are only required at initia...

Страница 11: ...cm Minimum 15 38 cm Maximum 3 8 cm Maximum Vent Combustion Air 12 30 cm Minimum above anticipated snow line Vent 3 8 cm Minimum separation 12 30 cm Minimum from overhang 12 30 cm Separation between bo...

Страница 12: ...t Combustion air must be clean outdoor air Do not take combustion air from inside structure because that air is frequently contaminated by halogens which includes fluorides chlorides phosphates bromid...

Страница 13: ...F493 Schedule 40 ABS ANSI ASTM D2235 IPEX is approved vent manufacturer in Canada listed to ULC S636 IPEX System 636 Cements and Primers are approved in Canada listed to ULC S636 DO NOT USE CELLULAR F...

Страница 14: ...Transition pieces not included Consider following when determining appropriate 5 location for termination of combustion air and vent piping Position termination where vent vapors will not A damage pla...

Страница 15: ...irements National Fuel Gas Code ANSI Z223 1 NFPA 54 Use pipe joint compound suitable for liquefied 2 petroleum gas on male threads only Use ground joint unions 3 Install sediment trap upstream of gas...

Страница 16: ...Service switch is pre wired and located on exterior boiler jacket See Figure 15 for location of service switch junction box and power supply connection points Connect black hot lead from power supply...

Страница 17: ...at 0 7 amps Connect 24 volt thermostat leads to the two 2 yellow wires located in service switch junction box located on outer jacket of boiler See Figure 15 Page 16 for service switch junction box an...

Страница 18: ...If any of the original wire as supplied with this appliance must be replaced it must be replaced with type 150 C Thermoplastic wire or its equivalent 8 ELECTRICAL WIRING Schematic Wiring Connections F...

Страница 19: ...TE If any of the original wire as supplied with this appliance must be replaced it must be replaced with type 150 C Thermoplastic wire or its equivalent 8 ELECTRICAL WIRING Ladder Wiring Diagram Figur...

Страница 20: ...ng failure mode as lack of flame signal Manually reset IBC from lockout by removing and C re establishing thermostat s call for heat or turn service switch off then back on See Figure 19 High Limit Co...

Страница 21: ...ame size as valve discharge opening to open drain tub or sink or other suitable drainage point Do not subject to freezing in accordance with A S M E Failure to provide pressure relief valve with pipin...

Страница 22: ...ll push towards expansion tank when boiler is placed in operation Inspect piping system Repair any leaks immediately 6 10 STARTUP Water Treatment And Freeze Protection See Appendix A Filling Boiler Wi...

Страница 23: ...ire department 10 STARTUP Operating Instructions STOP 1 Read the safety information on this page before operating this appliance Set the thermostat to the lowest setting 2 Turn off all electrical powe...

Страница 24: ...ing to boiler Refer to Check Gas Supply on page 15 Check for orifice in negative pressure hose at gas 3 valve and 2 air intake pipe upstream of gas valve Relight boiler 4 If boiler still does not ligh...

Страница 25: ...l automatically resets after 1 hour HIGH LIMIT CONTROL If boiler water temperature reaches high limit setpoint high limit n c contacts open immediately closing gas valve Valve and flame lights go out...

Страница 26: ...Gas valve and circulator pump are de energized valve and flame lights go out Blower runs for 30 seconds post purge purge light is on Blower is de energized after 30 seconds purge light shuts off Boil...

Страница 27: ...T YELLOW ORANGE GLOW OF THE HOT SURFACE IGNITER CAN BE OBSERVED THRU THE OBSERVATION PORT IN FRONT OF BOILER SECTION JUST ABOVE IGNITER IGNITOR LIGHT IS ON GAS VALVE ENERGIZED THRU 3K1 AND 4K1 CONTACT...

Страница 28: ...observation port on boiler A z B C z D E 6 After igniter warm up period integrated boiler control energizes gas valve initiating 6 second trial for ignition mode indicated by illumination of Lamp D La...

Страница 29: ...cific features of high limit control Test Other Safety Controls If boiler is equipped with low water cut off manual reset high limit or additional safety controls test for operation as outlined by con...

Страница 30: ...essure E between 4 and 10 w c natural gas between 10 and 14 w c propane gas Drill hole in plastic CPVCpipe for combustion analyzer 2 Turn thermostat to closed position to activate boiler 3 Allow boile...

Страница 31: ...eration during this condition Important System must be checked by qualified service agency prior to resuming operation 4 ECONOMY ACTIVE Indicates that thermal targeting function is active and control...

Страница 32: ...ng Low Water Control is Sensing High Temperature Boiler Reached Target Temperature Boiler in Purge Mode and will not fire until temperature drops to 140 F See Purge page 36 Both red and yellow LEDs ar...

Страница 33: ...losion or shock hazard may cause death or serious injury Do not attempt to modify physical or electrical characteristics of this boiler in any way In reset from lockout condition all electrical meter...

Страница 34: ...low is not proven Off during igniter and run cycle normal operation purge cycle complete Blinking IBC is locked out Problem could indicate false positive proof of air flow Blocked vent intake air pipe...

Страница 35: ...35 Troubleshooting Chart 1 15 TROUBLESHOOTING...

Страница 36: ...36 Troubleshooting Chart 2 15 TROUBLESHOOTING...

Страница 37: ...AGS OR LOW SPOTS WHERE CONDENSATE MAY PUDDLE AND BLOCK THE VENT YES CHECK AIR PRESSURE SWITCH PER INSTRUCTIONS ON FOLLOWING PAGES ARE SAMPLING LINES CLEAR AND CONNECTED PROPERLY NO CLEAN OUT SAMPLING...

Страница 38: ...LIGHT CHECK FOR 24 VAC ACROSS TERMINALS MV ON THE GAS CONTROL WHILE VALVE FLAME INDICATOR LIGHT IS ON NO NO CHECK FOR 24 VAC ACROSS TERMINALS CN6 2 AND CN6 5 ON IBC WHILE THE VALVE FLAME LED IS LIT NO...

Страница 39: ...39 Troubleshooting Chart 5 15 TROUBLESHOOTING...

Страница 40: ...C INSTRUCTIONS REQUIRES SPECIFIC TOOLS NO YES REPLACE BURNER REPLACE IBC BOILER SHUTS OFF BEFORE END OF CALL FOR HEAT ARE HI LIMIT AQUASTAT CONTACTS CLOSED NO BOILER OFF ON HIGH LIMIT IS ACTUAL BOILER...

Страница 41: ...suction lines to switch Blockage or moisture in orifice installed in suction lines to switch Blockage in air intake or vent pipes Undersized air intake or vent pipes Loose blower wheel on motor shaft...

Страница 42: ...sary Remove jacket front and top panels and check for H piping leaks around relief valve and other fittings Repair if found DO NOT use stop leak compounds Check boiler area is free from combustible ma...

Страница 43: ...nside burner Remove any foreign matter by blowing with compressed air or vacuuming Install burner and gaskets Position blower adapter L assembly over studs Install five nuts do not tighten Install ign...

Страница 44: ...l or any other supplemental instruction or addendum Apply this information in place of any related information in Installation Operation Maintenance Manual Accompanying this boiler DIELECTRIC ISOLATIO...

Страница 45: ...m meets these requirements System fluid pH maintained between 7 0 and 8 0 Maintain water hardness below 7 grains hardness Filling with chlorinated potable water is acceptable DO NOT fill boiler with w...

Страница 46: ...to maintain a pH within recommended level Follow antifreeze manufacturer s instructions to adjust pH If system has leaked water and antifreeze chemistry will need to be adjusted To avoid damage to boi...

Страница 47: ...stributor 15363 117 Avenue Edmonton AB T5M 3X4 Canada www hydronicagencies com Tel 780 452 8661 Fax 780 488 2304 Fernox www fernox com Intercool NFP 30 40 50 AA Intercool RPH 15 Interstate Chemical 27...

Страница 48: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: