3.1 Component Listing - Refer to diagrams on 

following pages.

1. 

Gas Shutoff Valve (Field Installed)  Fuel supply 

isolation during servicing. Factory supplied, Field installed. 

See section 7.

2. 

Vent Connector  See section 6.

3. 

Combustion Air Inlet (2"/3") See section 6.

4. 

Igniter

5. 

Flame Sensor

6. 

Sight Glass  

Permits observation of burner flame.

7. 

Flue Air Mixture Pressure Test Port - Not available 

on all models.

8. 

User Interface Displays information regarding boiler 

condition. Allows adjustment of boiler operating 

parameters. NOTE: Does not replace thermostat used 

to control central heating space.

9. 

Boiler Control Module 

10. 

Heat Exchanger

11. 

ASME Plate

12. 

Low Voltage Terminal Strip Connection of all low 

voltage wiring, including thermostat. 

13. 

Return Water Temperature Sensor

14. 

Return Water From Heating System (In) and 

Drain Valve Connection supplied at bottom of boiler. 

See section 5.

15. 

Condensate Drain  Boiler produces a liquid 

(condensate) as a by-product of combustion. (See page 

14)  

16. 

Condensate Trap (Field Installed) Condensate must 

be piped to appropriate drain. See section 6.

17. 

Jacket Panel Latch

18. 

Supply Water Outlet to Heating System (Out)  

Connections supplied for connecting from bottom of 

boiler. See section 5.

19. 

Temperature Pressure Gauge (Field Installed)

20. 

High Voltage Junction Box For connection of 120V 

components.  See section 8.

21. 

Flue Collector

22. 

Vent Temperature Sensor

23. 

Combustion Analysis Test Port

24. 

Gas (Control) Valve Delivers proper quantity of fuel 

to Combustion Air Blower. See section 7. 

25. 

Combustion Air Blower Delivers proper quantity of 

combustion air, receives fuel from gas valve, mixes air 

and fuel sending mixture to burner for combustion.

26. 

Heat Exchanger Surface Temperature Switch

27. 

Supply Water Temperature Sensor and High Limit 

Switch

28. 

Safety Relief Valve Factory supplied, Field installed. 

See section 5.

29. 

Pump Relay

30. 

Burner not shown (see page 39) 

31. 

Wall Hanging Support Bracket not shown (see page 

12) Integral to boiler.  Allows wall mounting when used 

with supplied wall mounting bracket. See section 4.

32. 

Gas Connection (See section 7)

3 - COMPONENT LISTING

 P/N# 2400010616, Rev. E [07/2015]

Содержание Olsen OLSSV-050

Страница 1: ...ALLATION OPERATION MAINTENANCE MANUAL P N 2400010616 Rev E 07 2015 Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com Models OLSSV 050 OLSSV 075 O...

Страница 2: ...l wire knockouts Stopper Rubber 5 16 2 ea 15 Used for packaging holes on back of boiler Plastic Plug 2 ea 16 Used for packaging holes on back of boiler Outdoor Sensor 17 Used for measuring outside tem...

Страница 3: ...G 2 22 56 4mm 2 51mm Location H 2 33 59mm 3 76mm Condensate Drain Connection Location I 9 32 237mm 11 282mm Location J 1 4 35 6mm 4 6 116 8 Size 3 4 NPT 3 4 NPT Gas Connection Top of Boiler Size K 1...

Страница 4: ...ensate Piping 31 7 Gas Supply Piping 32 8 Electrical Connections 34 8 3 Line Voltage Connections 34 8 4 External Connections 34 9 Start Up Procedure 36 9 6 Perform CSD 1 Compliance Test 40 9 7 Complet...

Страница 5: ...sign temperature 1 3 Operational Features Modulating 20 100 Integral Dual Limit Connection provided for required field sourced low water cutoff LWCO Outdoor Temperature Reset Integral Multiple Boiler...

Страница 6: ...tallation could result in death or serious injury Read this manual and understand all requirements before beginning installation 2 3 Installation shall conform to requirements of authority having juri...

Страница 7: ...on See page 14 16 Condensate Trap Field Installed Condensate must be piped to appropriate drain See section 6 17 Jacket Panel Latch 18 Supply Water Outlet to Heating System Out Connections supplied fo...

Страница 8: ...31 WALL MOUNT SUPPORT BRACKET 3 COMPONENT LISTING 050 075 100 150 200 SIZE SHOWN 32 GAS CONNECTION FIGURE 3 2 Jacket Removal Viewed from Bottom of Boiler Jacket Latch Lift latch to dis engage Bottom o...

Страница 9: ...ATING SYSTEM OUT 12 LOW VOLTAGE TERMINAL STRIP 22 VENT TEMPERATURE SENSOR 1 GAS CONNECTION SHUT OFF VALVE 23 COMBUSTION ANALYSIS TEST PORT 20 HIGH VOLTAGE JUNCTION BOX 10 HEAT EXCHANGER 9 BOILER CONTR...

Страница 10: ...OM HEATING SYSTEM IN 18 SUPPLY WATER TO HEATING SYSTEM OUT 12 LOW VOLTAGE TERMINAL STRIP 1 GAS CONNECTION SHUT OFF VALVE 20 HIGH VOLTAGE JUNCTION BOX 10 HEAT EXCHANGER 9 BOILER CONTROL MODULE Fuse and...

Страница 11: ...freeze solution during boiler service or from safety relief valve discharge See section 5 Access to system water piping gas supply and electrical service See sections 5 7 and 8 Clearances to combustib...

Страница 12: ...ee figure 4 2 Boiler includes 4 3 8 x 3 lag screws and 4 washers for attaching wall mount bracket to wood studs Field source appropriate fasteners for other wall constructions masonry concrete Attach...

Страница 13: ...cycle 5 3 Safety Relief Valve NOTICE Boiler rated at 150 psig 1 03 MPa maximum allowable working pressure Boiler provided with 30 psig 206 kPa safety relief valve Field source safety relief valve for...

Страница 14: ...entral heating pumps Boiler control allows domestic hot water prioritization Function could be lost if central heating pump not directly connected to control system Multiple boiler system See figures...

Страница 15: ...tand Pipe System Return System Supply No Valves 12 Max Air Vent Safety Relief Valve LWCO Pipe to condensate drain System Supply System Return MINIMUM ACCEPTABLE HEIGHT FOR LWCO PROBE Air Vent LWCO Saf...

Страница 16: ...ned System With Zone Valves figure 5 8A With Zone Pumps Not Shown Primary Secondary Pumping Without DHW Tank figure 5 8B With DHW Tank figure 5 8C NOTICE Illustrations are meant to show system piping...

Страница 17: ...ves FIGURE 5 6 Single Boiler Primary Secondary Two Pipe Zoned System With Zone Pumps DHW Pump CH System Pump DHW Pump Zone Pump 5 HYDRONIC PIPING Primary Loop Equivalent Length Calculation Pump Select...

Страница 18: ...ndary Pumping FIGURE 5 7B Single Boiler Using Primary Secondary Pumping With DHW Tank CH System Pump closely spaced tees in primary system loop Limit length to 5 1 6m 12 305mm Maximum separation Limit...

Страница 19: ...lves See Multiple Boiler Guide 5 HYDRONIC PIPING P N 2400010616 Rev E 07 2015 Up to 16 boilers DHW Pump See Multiple Boiler Guide CH System Pump 12 305mm Maximum Separation System Temperature Sensor S...

Страница 20: ...g 5 HYDRONIC PIPING P N 2400010616 Rev E 07 2015 Closely spaced tees in primary system loop 12 305mm Maximum Separation Up to 16 boilers CH System Pump System Temperature Sensor Size common piping per...

Страница 21: ...Tank Closely spaced tees in primary system loop CH System Pump 12 305mm Maximum Separation System Temperature Sensor Size common piping per maximum heat capacity of entire system Limit length to 5 1 6...

Страница 22: ...so appliances will operate continuously Test for spillage at draft hood relief opening after 5 minutes of main burner operation Use flame of match or candle smoke from cigarette cigar or pipe Determi...

Страница 23: ...Max 50 ft 15 2 m 100 ft 30 5 m 100 ft 30 5 m Table 5 Combustion Air and Vent Piping Length For Example Boiler can be installed on outside wall and vented with one 90 elbow and 1 ft 0 30 m of vent pip...

Страница 24: ...h Air Roof Single Pipe Figure 6 10 Side Wall Two Pipe Figures 6 2 6 3 Concentric Figures 6 4 6 5 6 6 Inside Air Single Pipe Figure 6 11 Table 7A Combustion Air Venting Locations Type Location Terminal...

Страница 25: ...f different appliances 15 381mm Max horizontal length of vent Min vent intake between different appliances 12 305mm Max allowable total vertical vent length with outside exposure is 10 ft 3 05m Abando...

Страница 26: ...g strap must be field installed to prevent movement of termination kit in side wall Vent Combustion Air 1 25 4mm Maximum See Note 2 or 3 51 or 76 mm Diameter PVC intake combustion air Combustion Air 2...

Страница 27: ...el 24 610mm above roof FIGURE 6 8 Flue on Roof Air Intake on Side Wall FIGURE 6 9 Flue on Roof Combustion Air Grade Snow Ice Terminate vent system bottom minimum 12 305mm above highest anticipated sno...

Страница 28: ...as shown in Fig 6 14 does not have a max separation requirement between flue gas and fresh air FIGURE 6 14 Side Wall Venting Terminal w T Terminal Combustion Air Vent w Accelerator 1 25 4mm Max Separ...

Страница 29: ...dense forming moisture may be corrosive Protect building materials at vent from exhaust of vent gas 12 305mm Min Termination Forced Air Inlet 3 0 9m If located within 10 3m of forced air inlet Termina...

Страница 30: ...recirculated vent gases Give consideration to excessive wind and locate away from windward side of building Vapors Position termination where vent vapors are not objectionable Walkways Locate vent ter...

Страница 31: ...boiler and field sourced piping to condensate drain at bottom of boiler See figure 6 20 Slope condensate drain pipe minimum 1 4 per foot 21mm m away from boiler Use field source condensate pump if boi...

Страница 32: ...ncluded with Boiler CAUTION WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier fr...

Страница 33: ...ncorrosive detection fluid or other leak detection method acceptable to authority having jurisdiction Do not use matches candles open flames or other methods that can provide ignition source Correct l...

Страница 34: ...le current draw See Figure 8 3 and Table 9 B Connect pump to line voltage terminal strip DHW PUMP L N G Primary Pump A Isolate pump from control module if pump FLA exceeds maximum allowable current dr...

Страница 35: ...em control with dry contacts related 0 5 amps 120 VAC Boiler control does not provide 24 VAC power to central heating thermostat B Locate and install thermostat per manufacturer s instructions Maximum...

Страница 36: ...until boiler resets Do not open gas shutoff valve until all air is purged from system 9 2 Fill Condensate Trap with Water Remove spring tension clip from clear hose attached to barbed fitting at botto...

Страница 37: ...C Temperature Units F F C Installer Menu Boiler Configuration Boiler Address 0 0 15 Required Low Water Cutoff Field Supplied Pump Mode 0 0 4 Service Reminder Status On ON OFF Service Reminder Days 365...

Страница 38: ...eating zones to dissipate heat Set boiler on high fire Use 1 or 2 cu ft dial on gas meter Measure time required for two or more complete revolutions Measure time for one or more minutes Calculate inpu...

Страница 39: ...Design Target A Natural Gas 9 0 9 5 9 5 200ppm 6 5 7 5 Propane 10 0 11 0 11 0 3 Switch to LOW fire in boiler System Test On user interface push Enter HIGH power starts flashing Scroll down to Low Powe...

Страница 40: ...00 MBH White Plastic Offset Screw Is Located Under The Aluminum Cap 4 See Figure 9 4 for location of Offset Screw on modulating gas valve of various boiler models T40 male Torx bit is necessary for re...

Страница 41: ...RE Combustion Analyzer Port Shown 50 75 100 Model FIGURE 9 7 Control Module J7 Connector J7 CONNECTOR 9 7 Complete Start Up Procedure 1 Reset control parameters to operating settings if adjusted to al...

Страница 42: ...gas shutoff valve to closed position Handle should be perpendicular to gas pipe Wait 5 minutes for any gas to clear Smell for gas including near floor If you smell gas STOP Follow instructions on thi...

Страница 43: ...e operating properly and are free of blockages or obstructions system air vent check venturi air inlet for blockage and clean as required verify pressure test port cap and combustion test port are in...

Страница 44: ...rner if it cannot be cleaned or is showing deterioration Clean heat exchanger with low pressure water spray Use flexible handle nylon brush to loosen sediment and oxide on all accessible heating surfa...

Страница 45: ...for installations above 4500 feet 1350 m above sea level SEA LEVEL RATINGS NATURAL AND PROPANE GASES Size Boiler Input Rate MBH 1 Heating Capacity MBH 1 2 Net AHRI Rating Water MBH 1 3 AFUE 2 Maximum...

Страница 46: ...in Release plug lock with finger remove and reconnect all 7 plugs Check wiring from User Interface to Low Voltage Terminal Strip including checking continuity of wires Does User Interface Display wor...

Страница 47: ...e High Temperature opens during normal operation Go to Page 53 Control Module detects flame after gas valve is closed more than 10 seconds Replace Gas Valve Flame is detected before gas valve opens Re...

Страница 48: ...ge 58 Boiler power supply ground wire is not grounded Go to Page 59 Control board internal error Power down then power up boiler If error repeatedly occurs replace control module Replace Control Modul...

Страница 49: ...Valve and J13 connector on Control Module NO YES Disconnect J13 connector on gas valve Measure resistance across top and bottom pins 1 5 Is resistance between 1 0 and 1 2 k NO YES Disconnect harness f...

Страница 50: ...50 13 TROUBLE SHOOTING P N 2400010616 Rev E 07 2015...

Страница 51: ...system if water is dirty Is boiler supply pipe above heat exchanger hot Wait for boiler to cool down YES NO Replace Broken Switch Unplug molex connector on supply temperature sensor Check continuity b...

Страница 52: ...52 13 TROUBLE SHOOTING P N 2400010616 Rev E 07 2015...

Страница 53: ...ty from J13 6 to Switch 3 continuity of the two purple wires Disconnect harness from High Temperature Supply Switch and Control Module J13 Check continuity of both purple wires Continuity available fo...

Страница 54: ...O APPLIANCE Replace Gas Valve Turn off manual gas shutoff valve Follow instructions TO TURN OFF GAS TO APPLIANCE Replace Gas Valve Follow Operating Instructions to initiate boiler operation Enter Inst...

Страница 55: ...6 connector is connected Verify continuity between low voltage terminal strip LWCO connections and J16 1 and J16 4 Continuity Disconnect LWCO from low voltage terminal strip Check for continuity throu...

Страница 56: ...rging all air out of the system Replace Flue Gas Sensor Replace Control Module Use thermal couple to measure flue gas temperature through sampling port Is the measured temperature and flue temperature...

Страница 57: ...water or antifreeze solution NO Is Primary Pump properly oriented YES NO Disconnect harness from Return Water Sensor Measure resistance using digital ohm meter Is resistance between 950 to 33 000 ohm...

Страница 58: ...t 60 Hz 2 Replace Control Module YES YES NO NO Replace circuit breaker 13 TROUBLE SHOOTING Fix the connection These error messages are displayed when the control board detects fault in blower motor sy...

Страница 59: ...K to 3K ohms 3K to 9K ohms 54 to 66 32 to 54 66 to 94 Supply Water Sensor Resistance Chart Disconnect field wiring Is continuity between field wiring neutral and ground less than 10 ohms Is field grou...

Страница 60: ...th digital meter Estimate Sensor temperature Do temperature and resistance fall within ranges shown in chart Replace Wires 50 to 90 10 to 32 9K to 24K ohms 150 to 200 90 to 130 F C Resistance 130 to 1...

Страница 61: ...Resistance Chart Disconnect wire harness from High Temperature Supply Switch Measure resistance across terminals 2 and 4 Does temperature fall within ranges shown in chart See Thermistor Resistance Ch...

Страница 62: ...l Module Disconnect wire harness from Vent Temperature Sensor Measure Sensor resistance Does resistance match estimated flue temperature NO YES _ P _ _ _ Blocking Error E 6 5 Flue Sens Shorted Replace...

Страница 63: ...10 50 22790 15 59 18290 20 68 14770 25 77 12000 30 86 9805 35 95 8055 40 104 6653 45 113 5524 50 122 4809 55 131 3863 60 140 3253 65 149 2752 70 158 2337 75 167 1994 80 176 1707 85 185 1467 90 194 12...

Страница 64: ...64 14 1 Connection Diagram 050 075 100 MBH 14 WIRING DIAGRAM P N 2400010616 Rev E 07 2015...

Страница 65: ...65 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM P N 2400010616 Rev E 07 2015...

Страница 66: ...66 14 3 Connection Diagram 150 200 MBH 14 WIRING DIAGRAM P N 2400010616 Rev E 07 2015...

Страница 67: ...67 14 4 Schematic Diagram of Ladder Form 150 200 MBH 14 WIRING DIAGRAM P N 2400010616 Rev E 07 2015...

Страница 68: ...eat or heat and light Complete combustion of fuel is possible only in presence of adequate supply of oxygen COMBUSTIBLE MATERIAL Materials made of or surfaced with wood compressed paper plant fibers o...

Страница 69: ...d to relieve pressure in hot water supply system when pressure exceeds pressure capability of equipment SAFETY SHUTOFF DEVICE Device that will shut off gas supply to controlled burner in event source...

Страница 70: ...ue Scroll down to next menu item Decrease value Boiler Status Indicator F Flame Detected P Central Heating System pump On B Combustion Air Blower On S Safety Relay Check G Gas Valve Open D DHW Pump On...

Страница 71: ...demand CH call is illustrated Control Module compares supply Temperature to set point Boiler proceeds to ignition if supply temperature is less than set point Combustion Air Blower speed modulates to...

Страница 72: ...g to heating demand When Boiler detects demand met will enter post purge mode then standby mode If simultaneous demand for Central Heat and DHW boiler will enter DHW Priority Mode Priority mode limits...

Страница 73: ...tiple boiler installation submenu used to view runtime parameters See Multiple Boiler Manual This line is not shown if boiler is not in cascade system Boiler Status Supply Temperature set point displa...

Страница 74: ...point and cannot be changed Controller calculates set point based on outdoor temperature Note For explanation of available CH heating modes refer to CH Mode section located in CH Settings submenu in I...

Страница 75: ...omestic hot Water control settings such as DHW priority time Cascade Settings Refer to Multiple Boiler Manual System Test Tool aids setup of boiler installation or diagnosis of common problems Boiler...

Страница 76: ...of safety period no flame detected control will go to post purge removing unburned gas Re ignition attempt started following same cycle Number of re ignition attempts limited to 3 after which lockout...

Страница 77: ...on Address Selection screen used to set boiler position in multiple boiler cascade installation Refer to Multiple Boiler Installation Manual Default setting of 0 indicates boiler is operating in singl...

Страница 78: ...ystem Pump electrical terminal block See page 35 for diagram DHW pump terminal does not function This is typical of hydronic system design which utilizes zone valves for all CH zones and DHW indirect...

Страница 79: ...er Shutdown temperature Boiler will permanently attempt to satisfy CH demand when CH demand is available CH thermostat input is ignored CH set point calculated as function of outdoor temperature using...

Страница 80: ...t Curve below Calculated CH set point always limited between Reset Curve Boiler Minimum Maximum temperatures See points C D of Reset Curve below Figure A 2 Outdoor Reset Curve Calculated supply temper...

Страница 81: ...tting 100 DHW Settings Two DHW modes are available DHW Mode 0 No DHW DHW Mode is disabled The DHW thermostat input is ignored and the DHW pump is not used DHW Mode 2 DHW Store with Thermostat Boiler r...

Страница 82: ...resent System Test has priority over any system demand while test mode activated System Test mode automatically ends after 30 minutes boiler resumes normal operation The following modes are available...

Страница 83: ...tie This harness will not be required when mounting user interface outside of boiler 7 Before installing user interface in new location route new two conductor wire through hole in back of user interf...

Страница 84: ...The figures below are based on industry average Consult valve fitting manufaturer for exact equivalent length or for fittings not shown below Chart 1 A B C Pipe Diameter Fitting Enter Number Of Fitti...

Страница 85: ...nter Total 1 straight pipe length in feet Add up numbers in column C Total equivalent length of Primary Multiply Total of Column C in Chart 3 by 0 088 Pump Factor Chart 4 Total Equivalent Length of 3...

Страница 86: ...re based on industry average Consult valve fitting manufaturer for exact equivalent length or for fittings not shown below Chart 1 A B C Pipe Diameter Fitting Enter Number of Fittings Multiply By Equi...

Страница 87: ...ift check valve 75 0 Enter Total 1 straight pipe length in feet Add up numbers in column C Total equivalent length of Primary Multiply Total of Column C in Chart 3 by 0 15 Pump Factor Chart 4 Total Eq...

Страница 88: ...ent system that serves the same function THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE An external energy management system is installed that reduces the boile...

Отзывы: