
41
9.7 Complete Start Up Procedure
1.
Reset control parameters to operating settings if
adjusted to allow startup and operation test.
2.
Follow instructions TO TURN OFF GAS TO APPLIANCE
(page 42) if boiler is not being placed into
immediate operation.
3.
Enter installer information on Warranty Registration
Card.
4.
Gather all instructions, manuals, wiring diagrams,
warranty registration card and other supporting
information. Review with user and/or affix in
conspicuous location adjacent to boiler.
FIGURE 9-8 Control Module J7 Connector
J7 CONNECTOR
9 - START UP PROCEDURE
Содержание Olsen OLSSC-050
Страница 47: ...47 13 TROUBLE SHOOTING...
Страница 51: ...51 13 TROUBLE SHOOTING...
Страница 53: ...53 13 TROUBLE SHOOTING...
Страница 62: ...62 Supply Water Temperature Sensor Resistance Chart 13 TROUBLE SHOOTING...
Страница 66: ...66 14 3 Connection Diagram 299 MBH 14 WIRING DIAGRAM EXTERNAL PUMP RELAY LIMIT OF 1 AMP PER PUMP SEE SECTION 8...
Страница 84: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...