![EcoWater CHC Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/ecowater/chc/chc_installation-and-service-manual_2355863039.webp)
39
Dip Slide Testing - Field Instructions
When collecting samples, you
follow these steps:
1
2
3
4
5
6
7
3
Seconds
Open
1 per
Tower
Submerge
Remove
Excess
Water
Close
Wait
48
Hours
Compare
and Record
You will need One Dip Slide per tower being treated by VRTX.
Open Dip Slide and remove the Test Strip (dip) from the bottle. .
Submerge the Test Strip in the water from the tower for three seconds being careful not to submerge
in high turbulence stream, this could damage the test strip.
Remove the Test Strip from the water and sling off any excess water by waving the strip from side
to side.
DO NOT ALLOW TEST STRIP TO TOUCH ANYTHING AT THIS POINT!!!!
Place Test Strip back into the supplied bottle and tighten lid.
Place the test in a location out of direct sunlight for a period of 48 hours. This location must have a
stable temperature in the appropriate range ( 77-95 degrees F).
After 48 hours, compare both sides of the Test Strip to the Results comparison page supplied
in the Dip Slide box.
Record the test results on the Customer Service Report and Send the report to VRTX.
Dispose of the dip Slide.
Order More Slides as required for each month.
EcoWater CHC.
EcoWater CHC.
Содержание CHC
Страница 1: ...INSTALLATION SERVICE MANUAL FOR THE CHC WATER TREATMENT SYSTEM ...
Страница 21: ...21 User Screen Structure E coW aterC H C CHC C H C C H C ...
Страница 22: ...22 CHC CHC CHC ...
Страница 26: ...26 F80 F300 Skid Equipment Views ...
Страница 38: ...38 ...
Страница 40: ...40 ...
Страница 41: ...41 ...
Страница 42: ...42 ...