EcoSource Low Voltage Installation
Figure 14-Wiring
Step 15
Starting at the bottom of the terminal block and working up, use a precision screwdriver to
secure each of the wires into the appropriate pins on the terminal block. Low voltage only:
Using 20-18 gauge wire, leave a minimum of 8” of spare wire exposed from the wall for
connection directly to the thermostat’s back plate screw terminals.
Step 16
Low voltage only: Ensure backplate has appropriate jumpers between R, SW1 and SW2. If
installing on a heat pump, ensure there is a jumper between Y1 and W1. See Figure 15.
Figure 15: EcoSource Backplate with Appropriate Jumpers
Step 17
Verify each wire is secure by gently tugging on it.
Step 18
Continue to Step 41
JBOX Using Vertical Mud Ring Instructions
•
Requires Telkonet JBOX Adapter Plate and two #6-32 1” screws
Step 19
Strip the LINE wire back 0.25 inches.
Step 20
Cap the LINE wire with a wire nut or electrical tape.
Step 21
Cut the COMMON wire so the copper is flush with the insulation.
Step 22
Strip all wires except for COMMON back 0.25 inches.
EcoWave Featur ing EcoTouch IO&M Guide
Telkonet, Inc.
For Use w ith Fir mw ar e Ver sion 2.x
20800 Sw enson Dr ive, Suite 175
EcoSour ce
Waukesha, WI 53186
Revision 2
(800) 380-9640
Page 16
w w w .telkonet.com