background image

          PARTS LIST FOR LARGE LIGHT BOX  

          COMPLETE ASSEMBLY #202835-LED 

 

          DESCRIPTION 

 

 

 

 

     PART NUMBER 

 

1.  Light Box cover only   

 

 

 

 

410466 

 

2.  Power Cord 

 

 

 

 

 

 

411242 

 

3.  Light Switch (on/off) 

 

 

 

 

 

411249 

 

4.  LED tube 7W / T8 / 5000K  (2 required) 

 

 

411240 

 

5.  Socket     

   

 

 

 

 

 

411245 

 

6.  Lamp Shield – large  (not shown) 

 

 

 

411422 

 

 

 

WARNING

: This fixture has been modified and no longer operates fluorescent lamps.  Ballast has 

been removed and there is line voltage being supplied to sockets. 

DO NOT INSTALL FLUORESCENT 

LAMPS

.

 

 

 

 

411240 LED TUBE  

 

#4 

 

411245 Socket 

 

#5   

#3 

411249

 

#

4104667

 

1  

 

#7 

    411422  

not shown 

#2 

411242  

Содержание 36-1 DP

Страница 1: ...36 1 DP PLEASE READ BEFORE USING THIS EQUIPMENT...

Страница 2: ......

Страница 3: ...file your claim STEP 1 Unpacking Cut the packing straps by using heavy duty scissors or wire cutter Remove the protective plastic wrap and cardboard Open the front door by unlatching and remove the l...

Страница 4: ...of the regulator and gauge STEP 6 Foot operated blast gun installation Connect the black hose from the foot pedal valve to the brass hose barb in the inch air filter no 12 Connect the red hose to the...

Страница 5: ...pot holds up to 100 pounds of media for long uninterrupted blasting When reusing any abrasive media be sure to use a filter to remove any extraneous materials which could clog the abrasive metering va...

Страница 6: ...d poor results Opening the abrasive metering valve will put more media into the mix while closing it will deliver more air and less abrasive Once the metering valve is properly set it will require onl...

Страница 7: ...ressor and the blast cabinet Good visibility speeds up work Clean dust from window often and replace the plastic window underlayment and window when needed The lamp shield will also become frosted and...

Страница 8: ...en attaching it to your blast equipment In order to maintain the high CFM and PSI you need at the blast nozzle we suggest using a minimum I D air line from your compressor to the blast machine 3 Blast...

Страница 9: ...LED tube 7W T8 5000K 2 required 411240 5 Socket 411245 6 Lamp Shield large not shown 411422 WARNING This fixture has been modified and no longer operates fluorescent lamps Ballast has been removed and...

Страница 10: ...x 6 seamless rubber pair left hand only right hand only 25 Armhole gasket 26 Front door gasket 27 Work table expanded metal 28 Side door handle assembly set Consists of Handle Latch 29 Side door 30 Si...

Страница 11: ......

Страница 12: ...1126 6 Abrasive Metering Valve 411125 7 Pipe Cross 411330 8 Square Head Pipe Plug 411331 9 Gauge 411116G 10 Abrasive Hose 8 required 413411 11 Media Valve 411160 12 Pressure Relief Valve 411130 14 Che...

Страница 13: ......

Страница 14: ......

Страница 15: ...r high pressure diaphragm part 411157 If the media valve does not shut off immediately upon releasing the foot pedal you may need to change the diaphragm For lower pressure uses we recommend installin...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ...ep media dry as possible Moderate humidity Use dryer or moisture separator High humidity Avoid usage if possible Overtaxed compressor Compressor too small Restrict time used Nozzle size too large Use...

Страница 20: ...OF EXPLANATION ON ACCEPTANCE OF CLAIM ECONOLINE WILL REPLACE DEFECTIVE PART CONDITIONS THIS WARRANTY DOES NOT APPLY IF THE UNIT HAS BEEN MISUSED ALTERED OR USED FOR ANY PURPOSE OTHER THAN IN ACCORDAN...

Отзывы: