6
Instructions
1. Position the unit on a level surface leaving enough space in front of the unit to remove the
compost tray.
– Minimum distance from the back wall to the front of the tray is 1100mm.
– Keep in mind you will need a 240V power point available somewhere near the unit.
– Be mindful of how the vent is to be installed as this may impact windows, etc.
2. Install the vent pipe either straight up through the ceiling or out through the wall and up
the exterior of the building.
– An optional vent wall kit is available.
– Do not use bends over 45˚.
3. Install the roof flashing and seal as required.
4. Insulate all parts of the vent pipe in roof cavities or outside the building using the insulation
provided and shield with 100mm pipe provided. Note: You may need to source extra
insulation.
5. Fit the insect netting cap to the top of the vent.
Installation
Tools required
SILICONE
Drill
Measuring
tape
Sealant/
adhesives
Saw
Ladder
55mm Hole saw
or Jigsaw
Fit insect netting
onto reducing
coupling
Must be insulated
Содержание 25e
Страница 1: ...EcoLet 25e 65e Owner s Manual May 2022 ...
Страница 12: ...12 ...