
PowerSpout
React Pump Installation
© 2019 EcoInnovation Ltd (NZ) V2.1
Page 81
Mounting React pump base to support pegs
5.3.1.
Drive Four 50 x 50 x 1200mm treated timber
battens into the ground until firm using the
base as a location guide as shown.
The React pump will normally be some
distance from the PV array on the other side
of a stock proof fence and in closer proximity
to the water resource.
The pictures that follow are from the
construction of our React pump test base
where each React pump is tested prior to
boxing and final despatch.
Mark a level line at 400mm above ground
height.
Cut battens to height.
Pilot drill holes and attach React pump base
with 100mm long stainless tek screws while
ensuring it is all level.