EN
5
Wiring Chart
Product Installation
Gauge (AWG)
UL1015 Wire Current (A)
THHN Wire Current (A)
16
25
14
35
20
12
45
25
10
60
35
8
80
50
6
120
65
Flush Installation Guide
1. Select installation position, position the framing template and find level with a leveling
instrument. Draw cutting lines along the template, and use sawing tools to cut a 325
mm x 181 mm rectangular opening for flush intallation.
Product Usage
181m
m
H 81m
m
1.2
1.1
Содержание EFM100-LD-HV
Страница 1: ...AC DC SMART DISTRIBUTION PANEL User Manual V1 0 EFM100 LD HV...
Страница 2: ......
Страница 19: ...Ecoflow App...