STEP 03
PART: QTY:
DESCRIPTION:
POST 6
1
RR91 @ 88” w. Base Plate
BEAM 7
2
Z45 FORMED BEAM w/ LOCKS
STEPS:
1- Attach BEAM 7 and POST 6
Страница 1: ...SETUPS RIO 10X10 ...
Страница 2: ...GENERAL ...
Страница 3: ...3 2 Z45 Beam Formed w Locks BEAM 4 1 Z45 w Door Stops INFILL 1 1 56 5625 x 45 Laminated Reco INFILL 3 1 Reco Infill STEPS 1 Attach BEAM 2 to Both POST 1 and POST 2 2 Attach BEAM 3 3 Insert INFILL 3 and Attached BEAM 2 NOTE Door Hinge Channel Should be Above BEAM 3 STEPS 1 Slide INFILL 1 in place and Secure BEAM 2 2 Place and Secure BEAM4 and BEAM 3 POST 1 POST 2 BEAM 2 BEAM 2 BEAM 2 INFILL 3 BEAM ...
Страница 4: ...COUNTER 1 Custom Bamboo Top DOOR 2 Pre Assembled Doors w White Infill STEPS 1 Attach BEAM 2 to Both POST 1 and POST 2 2 Attach BEAM 3 3 Insert INFILL 3 and Attached BEAM 2 NOTE Door Hinge Channel Should be Above BEAM 3 COUNTER DOOR ...
Страница 5: ...STEP 03 PART QTY DESCRIPTION POST 6 1 RR91 88 w Base Plate BEAM 7 2 Z45 FORMED BEAM w LOCKS STEPS 1 Attach BEAM 7 and POST 6 BEAM 7 BEAM 7 POST 6 ...
Страница 6: ...PHOTOS ...